Short-Circuit Current Calculator
Estimate three-phase and single-phase fault current, motor backfeed and peak current using a simplified IEC 60909 impedance model. Compare duty with breaker capacity.
This short circuit current calculator estimates initial fault current at the end of a radial low-voltage feeder. Engineers can use it to compare transformer and cable options, students can follow the impedance calculation, and maintenance planners can review a documented fault-level estimate. Results include three-phase RMS current Ik3, single-phase RMS current Ik1, the three-phase peak current, and a comparison with an entered breaker breaking capacity.
Start with the nominal LV line-to-line system voltage and the voltage factor for your study. Enter the transformer rated primary and secondary voltages separately: a 400 V system can have a 420 V rated secondary. Nominal system voltage sets the fault-driving voltage; nameplate voltages set transformer impedance and the transformation ratio. Enter the utility nominal voltage, initial short-circuit power and its calculation factor, or select an infinite upstream bus for a transformer-limited calculation. Other transformer inputs are rated apparent power, short-circuit voltage and three-phase load loss. The optional impedance correction follows the simplified IEC 60909-0:2016 treatment described in the method notes.
Enter the feeder length and effective positive-sequence resistance and reactance per kilometre. These values must already represent the installed parallel conductors, temperature, frequency and layout. Cold conductors normally matter for maximum duty; warmer conductors and an appropriate lower voltage factor are needed for a separate minimum-current study. The catalog metric/US switch converts length and power fields where applicable; voltage, current and impedance remain in their usual electrical units.
For a delta-primary, grounded-star secondary transformer, select the metallic-return model and supply the neutral or protective-conductor impedance. The transformer zero-sequence ratio is an explicit assumption, not a universal transformer property. Alternatively, enter the complete zero-sequence equivalent at the feeder origin and for the feeder itself. This is essential when a different vector group, neutral grounding or mutual coupling changes the earth-fault path.
Running induction motors can feed a fault briefly. Enable the local motor bank and enter its total rated current, locked-rotor ratio and R/X. The model places this bank directly at the fault bus and combines its contribution with the utility branch as phasors. Remote motors require their feeder impedances in a more detailed study. The chart shows how prospective currents change with feeder length while the local motor bank stays at the fault bus.
This IEC 60909 calculator is a simplified planning tool based on the 2016 method; IEC published a newer edition in 2026. Check against the standard in force and the equipment manufacturer's data. The fault current calculator does not assess arc flash, protection operating time, selectivity, cable thermal withstand, converter current limits, meshed networks, generators, IT systems or TT earth-electrode faults. A positive breaking-capacity reserve covers only the modelled initial RMS duty at the entered voltage. Installation work belongs to a qualified person.
How it is calculated
This is a simplified radial impedance implementation of IEC 60909-0:2016, with no copied standard tables. It estimates initial symmetrical RMS currents; it does not implement the entire standard. The method basis is stated as of 25 October 2026. IEC 60909-0:2026 has superseded the 2016 edition: check against the standard in force.
Utility, transformer and cable
Keep nominal system voltage separate from transformer rated secondary voltage . The equivalent phase source is ; transformer impedance uses its nameplate voltage . For example, a 400 V system may have a transformer rated 420 V on its secondary. ABB Technical Application Paper No.15 (2017), printed pp.67–68 (PDF pp.69–70), distinguishes these quantities explicitly.
Enter the utility nominal primary-network voltage and the transformer rated primary voltage for the selected tap. The rated transformation ratio is . With utility initial fault power , the primary-side magnitude is and the LV-referred magnitude is . separates its components. Thus, when utility nominal and transformer rated primary voltages coincide, . The independent factor must match the utility study; use for a nominal-voltage impedance-base power . An infinite supply sets .
The transformer has , , and . These are the same impedance relationships used in Schneider's Electrical Installation Guide, sections on networks and transformers. Optional correction uses and , as described by DIgSILENT for IEC 60909-0:2016 §6.3.3. remains independent of the study's .
Cable impedance is with length converted to kilometres. Enter effective installed-circuit data; resistance and reactance are not both automatically divided by the number of parallel cables. The utility branch is .
Motor and sequence networks
ABB handbook §6.5.4, printed pp.224–225 (attached PDF p.115), gives the locked-rotor motor equivalent. The local motors are assumed rated at the nominal LV system voltage , independently of the transformer's secondary rating. With , ; entered R/X separates its components. A connected local motor contributes to a bolted three-phase fault. The utility and motor equivalent sources share the voltage and its phase. Their complex admittances combine to give ; with motors off . The approximation takes and motor zero-sequence admittance as zero.
For delta/grounded-star with a metallic return, . The delta blocks upstream utility zero-sequence current. and the effective return-path impedance are user data. ABB §6.5.4, attached PDF p.114, explains the sequence paths. Alternatively, enter the complete, already-corrected source/transformer zero sequence and the complete cable zero sequence directly.
The symmetrical-component connection gives
The single-phase current is for a bolted line-to-neutral or line-to-PE fault with the stated return path, not a generic earth-electrode fault. These equations follow the sequence treatment in ABB §6.5, attached PDF pp.113–117.
Peak and rating comparison
For each contributing branch use , then (ABB §6.6, printed p.229, attached PDF p.117). The reported three-phase peak envelope sums the utility and motor branch peaks. It is a conservative branch-sum estimate within this model, not a timed waveform or a complete multi-infeed peak calculation.
Initial RMS duty is . Reserve is entered breaking capacity minus this duty. The comparison assumes an outgoing breaker immediately downstream of the modelled bus, carrying every included contribution. It does not infer current through an incomer or a motor branch.
Assumptions
- One balanced radial LV source, one two-winding transformer and one effective feeder. Nominal LV system voltage Un sets the equivalent source, while transformer nameplate voltages UrH and UrT set impedances and the rated transformation ratio. Utility nominal voltage UnQ is entered independently. Cable and custom zero-sequence impedances are physical ohms on the LV side, with no nominal-voltage rescaling.
- Bolted faults, negligible arc and breaker impedance, equal positive and negative sequence impedances, and no prefault load-voltage calculation.
- The default 400 V nominal system, 20 kV/400 V rated 1000 kVA, 6% transformer, 20 kV utility and 100 m feeder are illustrative study inputs, not a manufacturer catalogue. Replace them with site data. Cable resistance is entered at the chosen study temperature; reactance is entered at the actual 50 or 60 Hz frequency.
- In the delta/grounded-star mode the secondary neutral is solidly grounded. The default transformer Z0/Z1 ratio of 1 and the uncoupled metallic-return approximation must be confirmed for the transformer and installed conductor arrangement. Custom Z0 data include neutral earthing, mutual coupling and all zero-sequence paths.
- The local bank consists of running induction motors at the bus before the checked outgoing breaker, with equal source-voltage phases and motor nameplate voltage equal to nominal system voltage Un. Changing the transformer rated secondary voltage does not change the motor rated voltage. Motor Z1 and Z2 are approximated by the same locked-rotor impedance; motor Z0 is open. Remote motor cables, transient decay and converter controls are omitted. The default motor R/X of 0.42 is ABB's LV approximation (attached PDF p.115).
- For a maximum-duty study use the appropriate maximum voltage factor, highest utility fault level, cold cable resistance and all relevant running motors. For a separate minimum-current study enter the appropriate lower factor and hot conductor resistances and omit motor assistance; a single default run does not establish both extremes.
- The peak is an initial three-phase envelope. Motor current decay, contact-parting time, DC interruption capability and the single-phase peak are not calculated.
- The feeder-length chart changes only the feeder and its return path. The local motor bank stays at the receiving bus; it is not moved to the source end.
Where it applies
For preliminary radial LV studies at 50 or 60 Hz, using credible positive/negative/zero-sequence equivalents. Supported faults are balanced three-phase and bolted single-phase with a defined return. The custom sequence mode requires an engineer's network equivalent; it does not automatically resolve vector groups or earthing arrangements.
Excluded: IT faults, TT earth-electrode studies, meshed supplies, multiple transformers, synchronous generators, converter-fed motors, photovoltaic or battery inverter contributions, transformer saturation, remote motor feeders, arc flash, protection sensitivity and trip time, selectivity, cable I²t withstand, and current-limiting/cascading device combinations.
An adequate entered Icu/Icn reserve addresses only the modelled initial symmetrical RMS duty at the entered voltage. It is not a declaration of installation compliance or a full breaker selection. Check rated voltage, service breaking capacity Ics where required, making capacity Icm, asymmetric interruption duty, thermal/dynamic withstand and manufacturer coordination data separately. Do not compare the instantaneous peak directly with an RMS breaking rating.
This tool documents a simplified IEC 60909-0:2016 method; IEC 60909-0:2026 is the current edition at the stated review date. Check against the standard in force, applicable local rules and the equipment manufacturer's data. Installation work belongs to a qualified person.
References
- IEC 60909-0:2016, Short-circuit currents in three-phase a.c. systems, Part 0 (method edition; standard text not reproduced): https://webstore.iec.ch/en/publication/24100
- IEC 60909-0:2026, edition 3.0, published 23 July 2026 (current-edition notice checked 25 October 2026): https://webstore.iec.ch/en/publication/68454
- ABB, Electrical Installation Handbook, Vol.2, 3rd edition, 2005. §6.3.4 printed pp.212–215 (PDF pp.109–110), §6.5 printed pp.218–228 (PDF pp.112–117), §6.6 printed p.229 (PDF p.117): https://library.e.abb.com/public/e7db50d2e351a1e6c125704b00296284/1SDC010001D0203.pdf
- Schneider Electric, Electrical Installation Guide, 3-phase short-circuit current at any point within a LV installation, impedance method and Fig.G40 worked example: https://www.electrical-installation.org/enwiki/3-phase_short-circuit_current_(Isc)_at_any_point_within_a_LV_installation
- Schneider Electric, Electrical Installation Guide, secondary-terminal fault-current worked example, 400 kVA at 420 V: https://www.electrical-installation.org/enwiki/Short-circuit_current_at_the_secondary_terminals_of_a_MV/LV_distribution_transformer
- DIgSILENT PowerFactory knowledge base, effect of maximum voltage tolerance and transformer KT correction for IEC 60909-0:2016 §6.3.3: https://faq.digsilent.de/en/faq-reader-powerfactory/why-are-the-results-of-short-citcuit-calculation-depending-on-max-voltage-tolerance.html
- Schneider Electric, Electrical Installation Guide, selection of a circuit-breaker: https://www.electrical-installation.org/enwiki/Selection_of_a_circuit-breaker
- ABB, Technical Application Paper No.15, The MV/LV transformer substations (passive users), January 2017, printed pp.67–69 (PDF pp.69–71): nominal voltage for equivalent source, rated transformer voltage for impedance, and impedance referral through transformation ratio. https://library.e.abb.com/public/7a952b595c864de3b8cf13fbcbe7e956/AP_Cabine-MT-BT%28EN%29A-_1VCP000591%20-%202017.01.pdf
Inputs
| Input | Symbol | Unit | Default |
|---|---|---|---|
| LV nominal system line-to-line voltage Nominal voltage at the fault location, e.g. 400 V. Sets c × Un / √3; enter the transformer nameplate secondary voltage separately. | U_n | V | 400 |
| Fault-voltage factor c Enter the project maximum or minimum factor; no IEC voltage-factor table is embedded. | c_v | 1.1 | |
| Upstream supply | source_mode | Finite utility fault level | |
| Utility nominal line-to-line voltage Nominal primary-network voltage used to define the supplied short-circuit power; it may differ from the transformer rated primary voltage. | U_qn | kV | 20 |
| Utility initial short-circuit power Utility S''kQ at its nominal primary-network voltage UnQ; enter that voltage and the calculation factor cQ separately. | S_q | MVA | 250 |
| Voltage factor used for utility fault power Utility impedance is cQ × UnQ² / S''kQ before referral through the transformer rated ratio. Use 1 if the supplied fault power is the nominal-voltage impedance base U²/Z. | c_q | 1.1 | |
| Utility R/X ratio Enter the upstream source R/X, not X/R. | rx_q | 0.1 | |
| Transformer rated primary voltage Nameplate primary voltage for the selected tap, paired with the rated LV secondary voltage; sets the impedance transformation ratio. | U_rH | kV | 20 |
| Transformer rated LV secondary voltage Nameplate secondary voltage at the selected tap, e.g. 420 V for a 400 V system. Used for transformer impedances and the rated transformation ratio. | U_rT | V | 400 |
| Transformer rated apparent power Single two-winding transformer; all impedance data refer to this rating. | S_t | kVA | 1000 |
| Transformer short-circuit voltage Enter the nameplate uk percentage. | u_k | % | 6 |
| Transformer three-phase load loss Rated-current load loss at the impedance-test temperature. It must be below uk × rated kVA / 100. | P_k | kW | 13.3 |
| Apply transformer impedance correction KT = 0.95 cmax / (1 + 0.6 xT). Turn off for uncorrected impedance studies and the published handbook examples. | correct_t | true | |
| Maximum voltage factor for transformer correction Use cmax even when c is a minimum-fault factor. Check the applicable standard and transformer conditions. | c_max | 1.1 | |
| Feeder one-way length One equivalent feeder from transformer terminals to fault. Zero length represents a terminal fault. | L_c | m | 100 |
| Feeder positive-sequence resistance per length Effective resistance of all parallel phase conductors at the study temperature; enter manufacturer data. | r_c | ohm/km | 0.195 |
| Feeder positive-sequence reactance per length Effective reactance at the study frequency. Account for layout and mutual coupling before entering it. | x_c | ohm/km | 0.08 |
| Single-phase return path Ik1 is a bolted line-to-neutral or line-to-PE fault with a defined metallic return. IT and TT earth-electrode studies are excluded. | earth_model | Delta / grounded-star, metallic return | |
| Transformer Z0 / Z1 ratio Same R/X assumed for transformer zero sequence. Obtain the ratio from its manufacturer; 1 is illustrative. | k_zero | 1 | |
| Return-conductor resistance per length Effective N or PE impedance at the study temperature. The simplified uncoupled model uses Z0c = Zphase + 3 Zreturn. | r_ret | ohm/km | 0.195 |
| Return-conductor reactance per length Enter effective return-path reactance, including layout effects; use the custom mode if mutual coupling matters. | x_ret | ohm/km | 0.08 |
| Source and transformer zero-sequence resistance Total Z0 at feeder origin, already corrected and including 3Zn for neutral earthing. No further KT is applied. | R0_s | ohm | 0.002 |
| Source and transformer zero-sequence reactance Use a system study or manufacturer data; vector group and neutral grounding must be included. | X0_s | ohm | 0.009 |
| Feeder zero-sequence resistance per length Complete effective cable/return zero sequence; do not add the return conductor again. | r0_c | ohm/km | 0.78 |
| Feeder zero-sequence reactance per length Complete effective cable/return zero sequence at the study frequency. | x0_c | ohm/km | 0.32 |
| Include running induction motors One aggregate motor bank at the fault bus, before the checked outgoing breaker; no remote motor feeder is modelled. | motor_on | true | |
| Sum of running motor rated currents Three-phase induction motors rated for the nominal LV system voltage Un and connected directly to the bus; exclude stopped and converter-fed motors. | I_mr | A | 250 |
| Motor locked-rotor / rated-current ratio Use motor manufacturer data for motors rated at system voltage Un. Initial motor current is c × kLR × Ir in this equivalent-source model. | k_lr | 6 | |
| Motor R/X ratio Aggregate locked-rotor impedance R/X. ABB gives 0.42 as an LV approximation; actual data are preferable. | rx_m | 0.42 | |
| Breaker rated short-circuit breaking capacity Enter Icu or Icn at this system voltage for an outgoing breaker carrying all modelled contributions. Use Ics instead if service continuity is the criterion. | I_cu | kA | 25 |
Results
With the default inputs above, the calc gives:
| Result | Value |
|---|---|
| Three-phase fault Ik3 — initial RMS | 10.47 kA |
| Single-phase fault Ik1 — initial RMS | 5.55 kA |
| Three-phase peak envelope ip3 | 16.32 kA |
| Utility contribution to Ik3 | 8.975 kA |
| Motor contribution to Ik3 | 1.65 kA |
| RMS duty for breaking-capacity comparison | 10.47 kA |
| Reserve against entered breaking capacity | 14.53 kA |
| Initial RMS capacity comparison | Within entered RMS rating |
Checked against sources
Each case below was calculated by this calc and agrees with the value from its source (within the tolerance where one is shown).
ABB transformer and utility, printed pp.212–213
Source: ABB Electrical Installation Handbook, 2005, Vol.2, §6.3.4 Example 1, printed p.212 (attached PDF p.109). 1600 kVA, uk=6%, 400 V, utility 500 MVA; reported 36.6 kA. The source uses scalar short-circuit powers (pure-reactance approximation); no load loss or R/X is specified. Its rounded transformer power 26.7 MVA explains 36.54 kA here versus 36.6 kA. https://library.e.abb.com/public/e7db50d2e351a1e6c125704b00296284/1SDC010001D0203.pdf
Inputs: Fault-voltage factor c = 1; Voltage factor used for utility fault power = 1; Utility initial short-circuit power = 500 MVA; Utility R/X ratio = 0; Transformer rated apparent power = 1,600 kVA; Transformer three-phase load loss = 0 kW; Apply transformer impedance correction = no; Feeder one-way length = 0 m; Include running induction motors = no; the others as above.
| Result | Source | This calc |
|---|---|---|
| Three-phase fault Ik3 — initial RMS | 36.6 ± 0.1 kA | 36.541 kA |
ABB same bus with motor contribution
Source: ABB Electrical Installation Handbook, 2005, Vol.2, §6.3.4 Example 1, printed p.214 (attached PDF p.110). Outgoing CB3 duty 39.13 kA including a 385 A motor with locked-rotor ratio 6.6. Pure-reactance assumption follows the source's short-circuit power addition; rounded source powers explain the small difference. This tests the motor branch as well as the utility. https://library.e.abb.com/public/e7db50d2e351a1e6c125704b00296284/1SDC010001D0203.pdf
Inputs: Fault-voltage factor c = 1; Voltage factor used for utility fault power = 1; Utility initial short-circuit power = 500 MVA; Utility R/X ratio = 0; Transformer rated apparent power = 1,600 kVA; Transformer three-phase load loss = 0 kW; Apply transformer impedance correction = no; Feeder one-way length = 0 m; Sum of running motor rated currents = 385 A; Motor locked-rotor / rated-current ratio = 6.6; Motor R/X ratio = 0; the others as above.
| Result | Source | This calc |
|---|---|---|
| Three-phase fault Ik3 — initial RMS | 39.13 ± 0.1 kA | 39.082 kA |
Schneider G40 first switchboard
Source: Schneider Electric Electrical Installation Guide, Fig.G40: first switchboard Isc1=25 kA, 420 V, 1000 kVA, uk=5%, load loss 13.3 kW, utility 500 MVA, R/X=0.1, five metres of 4×240 mm² Cu per phase. Effective r=0.01928125 ohm/km from the example's resistivity 18.51 mΩ mm²/m; x=0.08 ohm/km stays undivided, as in the source. Published result is rounded; full-precision impedance calculation gives 25.31 kA. https://www.electrical-installation.org/enwiki/3-phase_short-circuit_current_(Isc)_at_any_point_within_a_LV_installation Voltage-base mapping: nominal system Un=400 V, rated secondary UrT=420 V, and c=1.05 reproduce the source's explicit 420 V no-load driving voltage without conflating nominal and nameplate voltage. Transformer correction remains disabled to reproduce the published uncorrected example.
Inputs: Fault-voltage factor c = 1.05; Voltage factor used for utility fault power = 1; Utility initial short-circuit power = 500 MVA; Transformer short-circuit voltage = 5 %; Apply transformer impedance correction = no; Feeder one-way length = 5 m; Feeder positive-sequence resistance per length = 0.01928 Ω/km; Include running induction motors = no; Transformer rated LV secondary voltage = 420 V; the others as above.
| Result | Source | This calc |
|---|---|---|
| Three-phase fault Ik3 — initial RMS | 25 ± 0.4 kA | 25.314 kA |
Schneider G40 100m feeder
Source: Schneider Electric Electrical Installation Guide, Fig.G40: 8.7 kA after the additional 100 m, 95 mm² feeder. The initial 5 m cable and 100 m feeder are reduced to a single 105 m equivalent with r=0.18648206453634084 ohm/km and x=0.08 ohm/km, preserving the sum of both published cable impedances. No formula is fitted to the current. https://www.electrical-installation.org/enwiki/3-phase_short-circuit_current_(Isc)_at_any_point_within_a_LV_installation Voltage-base mapping: nominal system Un=400 V, rated secondary UrT=420 V, and c=1.05 reproduce the source's explicit 420 V no-load driving voltage without conflating nominal and nameplate voltage. Transformer correction remains disabled to reproduce the published uncorrected example.
Inputs: Fault-voltage factor c = 1.05; Voltage factor used for utility fault power = 1; Utility initial short-circuit power = 500 MVA; Transformer short-circuit voltage = 5 %; Apply transformer impedance correction = no; Feeder one-way length = 105 m; Feeder positive-sequence resistance per length = 0.1865 Ω/km; Include running induction motors = no; Transformer rated LV secondary voltage = 420 V; the others as above.
| Result | Source | This calc |
|---|---|---|
| Three-phase fault Ik3 — initial RMS | 8.7 ± 0.05 kA | 8.682 kA |
Schneider 400kVA terminal limit
Source: Schneider Electric Electrical Installation Guide, 'Short-circuit current at the secondary terminals', worked example: 400 kVA, 420 V, uk=4%, infinite primary supply, Isc=13.7 kA (rounded). Ik1 uses the same published value as a limiting-case inference from ABB §6.5 Table 3 (attached PDF p.117): for an infinite supply and zero cable length, Z0T=Z1T gives Ik1=Ik3. This checks the sequence-network boundary condition rather than a separate measurement. https://www.electrical-installation.org/enwiki/Short-circuit_current_at_the_secondary_terminals_of_a_MV/LV_distribution_transformer Voltage-base mapping: nominal system Un=400 V, rated secondary UrT=420 V, and c=1.05 reproduce the source's explicit 420 V no-load driving voltage without conflating nominal and nameplate voltage. Transformer correction remains disabled to reproduce the published uncorrected example.
Inputs: Fault-voltage factor c = 1.05; Upstream supply = Infinite bus (transformer only); Transformer rated apparent power = 400 kVA; Transformer short-circuit voltage = 4 %; Transformer three-phase load loss = 0 kW; Apply transformer impedance correction = no; Feeder one-way length = 0 m; Include running induction motors = no; Transformer rated LV secondary voltage = 420 V; the others as above.
| Result | Source | This calc |
|---|---|---|
| Three-phase fault Ik3 — initial RMS | 13.7 ± 0.05 kA | 13.746 kA |
| Single-phase fault Ik1 — initial RMS | 13.7 ± 0.05 kA | 13.746 kA |
Independent review: 400 V system and 420 V rated secondary
Source: User-supplied independent review regression: 400 V nominal system, 420 V rated transformer secondary, 1000 kVA, uk=6%, c=cmax=1.1, transformer correction enabled, infinite upstream supply, zero load loss, no feeder and no motors. Reviewer independently reports Ik3=23.795 kA; this number is not printed in ABB. Ik1 equals Ik3 in the stated Z0T=Z1T terminal-fault limit (ABB handbook §6.5 Table 3). ABB Technical Application Paper No.15, printed pp.67–68 (PDF pp.69–70), explicitly distinguishes nominal Un for the equivalent source from rated UrT for transformer impedance and gives rated-ratio impedance referral. https://library.e.abb.com/public/7a952b595c864de3b8cf13fbcbe7e956/AP_Cabine-MT-BT%28EN%29A-_1VCP000591%20-%202017.01.pdf
Inputs: Transformer rated LV secondary voltage = 420 V; Upstream supply = Infinite bus (transformer only); Transformer three-phase load loss = 0 kW; Feeder one-way length = 0 m; Include running induction motors = no; the others as above.
| Result | Source | This calc |
|---|---|---|
| Three-phase fault Ik3 — initial RMS | 23.795 kA | 23.795 kA |
| Single-phase fault Ik1 — initial RMS | 23.795 kA | 23.795 kA |
Related Resources
Related articles
Related courses
IEC Electrical Schematics and Industrial Control Panels
5
Original price was: 42 €.21 €Current price is: 21 €.
Basic Electrical Controls & Diagram Reading
7
Original price was: 32 €.18 €Current price is: 18 €.
Modeling Electrical Motor Faults with FEM Simulation using ANSYS MAXWELL
3
Original price was: 50 €.15 €Current price is: 15 €.







Responses