Power Factor Correction Calculator: kVAR, Savings & Resonance
Size a three-phase capacitor bank, compare star and delta capacitance, estimate tariff savings and screen resonance. Includes detuned reactors, power triangles and a motor no-load limit.
This power factor correction calculator sizes a three-phase capacitor bank from electrical input power, present lagging displacement power factor and a desired target. Engineers can compare a proposed bank, students can follow the power triangle, and facility teams can estimate the effect on current, capacity and an entered energy tariff.
Enter the load kW at the bank bus, line-to-line RMS voltage and frequency. Use measured electrical input power for a motor; shaft nameplate kW is not the same quantity. The present power factor must be the fundamental displacement factor, cos φ. Harmonic distortion can lower true power factor even when displacement factor is already high.
Automatic sizing calculates the kvar required to improve power factor without rounding to a commercial size. To use this as a capacitor bank kvar calculator for an offered assembly, select the entered-bank mode and provide its net three-phase output at the operating voltage and frequency. The achieved power factor and before/after table then describe that bank. Leading compensation is rejected.
Choose star or delta to obtain capacitance per phase or branch. A selected detuned reactor changes both capacitance and capacitor voltage: the calculated voltage is the fundamental RMS stress, not a recommended nameplate rating. Reactor inductance and series tuning frequency help compare candidates. Schneider describes 5.7%, 7% and 14% as common detuning factors; the lowest significant harmonic and actual equipment duty still require verification.
The resonance check uses the bus short-circuit power and total connected kvar. With reactors selected, it deliberately shows the hypothetical bare-bank result at the same net kvar, not the resonance of the actual detuned network. Proximity to common harmonics is flagged with an illustrative 10% band. Being outside that band does not establish safe harmonic performance. Include other simultaneously connected plain banks and assess every switching state.
For a motor-terminal bank, enter measured or manufacturer no-load magnetising kvar. Automatic sizing limits capacitor-element output to 90% of this quantity and reports an unattainable target; an excessive entered bank is rejected. This conservative check does not replace manufacturer limits, coordinated switching or a self-excitation study for high-inertia loads.
Savings use either an entered kVAh price or a kvarh price above an entered free allowance. Results are gross annual estimates for one steady operating point, in your chosen currency units. Feeder energy savings are reported separately and are not added to tariff savings. Equipment losses, demand charges, taxes and maintenance are excluded.
This tool covers balanced sinusoidal steady-state sizing, not switching transients, harmonic filter design, protection or installation compliance. Check final equipment against manufacturer instructions and the standard in force. Installation work belongs to a qualified person.
How it is calculated
Fundamental compensation and current
For a balanced three-phase load, and . The ideal net bank is
The evaluated bank gives , and . Supply current is , with power converted explicitly to VA. The motor/load itself keeps its original PF; improvement applies upstream of the capacitor connection. Source: Schneider Electric Electrical Installation Guide 2016, chapter L, attached s1 page 8 (printed L8).
Capacitors with or without series reactors
The branch equations below are derived here from and , with and :
Here Q is in var, C in F, and U in V. For a plain bank, p is zero. The selected branch sees , carries , and needs . Capacitor-element reactive power is . The series tuning order is and frequency . Schneider L24 (s1 page 24) gives the common 5.7%, 7%, 14% candidates and notes the increased capacitor voltage. Calculated voltage is fundamental stress only; select a suitable rated assembly with harmonic and tolerance margins.
Resonance screen
Use Ssc in kVA and Q in kvar at the same bus. This is Schneider's undetuned, predominantly inductive source approximation (s1 page 23, L23). For a detuned candidate, this tool shows a hypothetical plain bank at the same net kvar, not an actual network pole. Other banks are included here only: the entered present PF already reflects existing correction. The nearest of harmonics 3, 5, 7, 11, 13, 17, 19, 23 and 25 is reported. A 10% relative band is an author-selected screening aid, not a standard acceptance limit. Tune below the lowest significant harmonic; the spectrum and network study decide suitability.
Losses and user-entered tariffs
Three-phase feeder copper loss is . Its relative reduction is ; annual saved feeder energy is the difference in kW times entered hours. At the load bus, kVAh charges are ; excess-kvarh charges are , where a is the contract's free kvarh/kWh allowance. Before-minus-after gives gross annual tariff saving. No tariff schedule is embedded; CU denotes the same user-chosen currency throughout. Do not add feeder energy savings to the displayed charge saving without modelling the meter location.
Direct motor-terminal constraint
Using the no-load magnetising Q0 supplied by the user, capacitor-element kvar is limited to . Automatic mode therefore caps net output at and shows any target shortfall. This is a conservative extension of the 90% no-load rule to a detuned assembly. Schneider L20 (s1 page 20) uses approximately for a nearly reactive no-load current; ABB paper 8, printed page 15, states the 90% Q0 rule. Manual mode rejects an excessive bank.
Target sweeps
The kvar sizing curve shows the ideal requirement without a motor ceiling. The current curve instead evaluates automatic bank sizing at each requested target and applies the same motor no-load ceiling used by the result cards. In motor mode it therefore plateaus when additional compensation is disallowed. These curves compare prospective automatic banks even when an entered bank is being evaluated.
Assumptions
- Balanced three-phase RMS quantities and a constant operating point. The power factors are lagging fundamental displacement factors, not distorted true PF.
- P is electrical input power at the capacitor bus, constant before and after; source voltage and feeder resistance stay fixed. Installation calculations do not include motor efficiency or a shaft-power conversion.
- The entered bank rating is its net fundamental output at the stated bus voltage and frequency, including the selected reactor. It is not automatically corrected from a capacitor nameplate at another voltage.
- Each star phase or delta branch has identical C and, where selected, identical series L. Reactors and capacitors are ideal for sizing; losses, tolerances, saturation and harmonic currents are excluded.
- The resistance is one upstream phase conductor, not a three-phase sum or loop resistance. Only that upstream segment benefits.
- No-load magnetising kvar must come from a measurement or the motor manufacturer at the entered voltage and frequency. The equations for capacitance, branch voltage, loss and conservation are derived here from elementary circuit relationships.
- Annual hours describe an equivalent steady load; rates and the reactive allowance are user data. The default allowance and prices are illustrative, with no jurisdiction or utility implied.
Where it applies
Use for preliminary engineering sizing and teaching on balanced 45–65 Hz three-phase systems. Commercial capacitor stages, insulation level, switching inrush, discharge, protection, conductor sizing and installation arrangements need separate selection. At medium voltage, equipment and switching requirements need a specialist design.
The undetuned resonance approximation neglects damping, other network branches, generators, cables and harmonic source impedances. It does not calculate amplification, THD, filter absorption or the poles of a detuned network. Evaluate every bank switching state and the full measured spectrum, including harmonics outside the screened list. Unknown spectra need measurement; an order outside the illustrative 10% band is not a safety clearance. Triplen behaviour depends on the connection and grounding. With no connected bank, undefined resonance and inductance are shown as gaps.
Motor no-load limiting is necessary but does not certify freedom from self-excitation. Manufacturer limits take precedence; high-inertia loads, residual speed, shared banks, supply loss and coordinated capacitor/motor switching need an engineering review. Automatic sizing may intentionally leave the requested PF unmet. An entered bank that creates leading operation or exceeds the motor ceiling is rejected.
Feeder-loss estimates assume a modest voltage drop; a warning asks for a fuller model above 10% calculated feeder loss. No net equipment energy saving, payback, demand-charge saving or guaranteed bill reduction is claimed. Metering intervals, variable loads, step controllers, capacitor/reactor losses and utility billing rules can change the result.
Method sources: Schneider Electric Electrical Installation Guide 2016, chapter L, cross-checked against the open wiki on 2026-10-28, and ABB Technical Application Paper 8. This is not a compliance calculator tied to a particular code edition or tariff date. Check against the standard in force and the current contract. Installation work belongs to a qualified person.
References
- Schneider Electric, Electrical Installation Guide 2016, chapter L, L8/L20/L23–L24. Attached s1 is the unmodified chapter excerpt, original PDF pages 371–396: https://electrical-engineering-portal.com/res/res4/Electrical-Installation-Guide-2016.pdf
- Schneider Electric, Theoretical principles to improve power factor, open Electrical Installation Guide wiki, checked 2026-10-28: https://www.electrical-installation.org/enwiki/Theoretical_principles_to_improve_power_factor
- Schneider Electric, Risk of resonance due to power-system harmonics, checked 2026-10-28: https://www.electrical-installation.org/enwiki/Risk_of_resonance_due_to_power-system_harmonics
- Schneider Electric, Possible solutions for power-system harmonics, common reactor factors and capacitor voltage considerations, attached s2, checked 2026-10-28: https://www.electrical-installation.org/enwiki/Possible_solutions_for_power-system_harmonics
- Schneider Electric, Power factor correction of induction motors, no-load/self-excitation limit: https://www.electrical-installation.org/enwiki/Power_factor_correction_of_induction_motors
- ABB, Technical Application Paper No.8, Power factor correction and harmonic filtering in electrical plants, printed pp14–15, attached s3: https://library.e.abb.com/public/4704e67320c08992c1257870002e4700/1SDC007107G0202.pdf
Inputs
| Input | Symbol | Unit | Default |
|---|---|---|---|
| Active input power Electrical active power at the bank bus. For a motor, use measured electrical input kW, not shaft nameplate kW. | P_load | kW | 100 |
| Present displacement power factor Lagging cos φ of the fundamental. A true PF degraded by harmonics cannot be corrected using this equation. | pf_1 | 0.8 | |
| Target displacement power factor Choose at least the present value. Unity is a theoretical limit; leave margin against leading operation. | pf_target | 0.95 | |
| Line-to-line RMS voltage | U_line | V | 400 |
| Supply frequency | f_line | Hz | 50 |
| Capacitor connection | connection | Delta · three equal branches | |
| Bank sizing Automatic mode uses the ideal required kvar, capped in motor mode. No commercial step size is assumed. | bank_mode | Calculate required bank | |
| Entered net bank output at this bus Net three-phase kvar delivered at the entered voltage and frequency, including any reactor. Do not enter a capacitor can's nameplate kvar at a different voltage. | Q_entered | kvar | 45 |
| Application | application | Installation / distribution bus | |
| Motor no-load magnetising reactive power Use a measurement or manufacturer value at this voltage and frequency. This tool limits capacitor-element kvar to 90% of this value; do not use rated-load kvar. | Q_no_load | kvar | 20 |
| Series reactor relative impedance p = XL/XC at the fundamental. This is a candidate for engineering review, not an automatic filter or product selection. | reactor | 7% · about 189 Hz at 50 Hz | |
| Lowest significant harmonic Select from measured voltage/current spectra. In three-wire delta systems, triplen behaviour needs a topology-specific study. | h_lowest | 5th · typical six-pulse drives | |
| Three-phase short-circuit power at bank bus Use the fault level at this point, including upstream impedance. As a transformer-only estimate, Ssc ≈ rated MVA / per-unit impedance. | S_sc | MVA | 10 |
| Other connected plain capacitor banks Total simultaneous kvar of other unreactored banks at this bus. Present PF already includes their compensation; they are added only in the resonance screen. | Q_existing | kvar | 0 |
| Upstream feeder resistance per phase Resistance of one phase conductor between the source and bank, at operating temperature. Only the feeder upstream of the bank benefits; excludes capacitor and reactor losses. | R_phase | ohm | 0.02 |
| Charge model Generic user-entered tariff, not a country-specific schedule. CU means any one currency; use the same currency throughout. | tariff | Apparent energy · kVAh | |
| Annual hours at this operating point Equivalent annual hours with this load, PF, voltage and bank connected. Annual savings are gross, before equipment and maintenance costs. | hours_year | h | 4000 |
| Apparent-energy rate (CU/kVAh) Enter currency units per kVAh from your bill. Fixed charges, demand charges, taxes and time bands are excluded. | rate_S | 0.12 | |
| Excess-reactive-energy rate (CU/kvarh) Enter currency units per billed kvarh. | rate_Q | 0.04 | |
| Free reactive-energy allowance / active energy Allowed kvarh per kWh. For example, enter 0 for all reactive energy billed, or your contract's threshold. The default 0.33 is illustrative, not a local tariff rule. | q_allowance | 0.33 |
Results
With the default inputs above, the calc gives:
| Result | Value |
|---|---|
| Ideal bank required | 42.13 kvar |
| Evaluated net bank | 42.13 kvar |
| Achieved displacement PF | 0.95 |
| Target shortfall · separate compensation needed | 0 kvar |
| Capacitance per phase / branch | 259.84 uF |
| Capacitor voltage · fundamental only | 430.1 V |
| Reactor per branch · 0 = none | 2.73 mH |
| Series tuning frequency | 189 Hz |
| Bare-bank resonance order · screen only | 15.41 |
| Gross annual tariff saving | 9,473.68 CU |
| Upstream I²R loss reduction | 29.09 % |
| Annual upstream feeder energy saved | 2,272.3 kWh |
| Bank and reactor assessment | Candidate tuning is below the lowest harmonic. Confirm harmonic duty and capacitor voltage rating. |
| Resonance screen | Bare-bank screen: within 10% of harmonic 17. A detailed harmonic study is needed. |
Checked against sources
Each case below was calculated by this calc and agrees with the value from its source (within the tolerance where one is shown).
Schneider L8 · 100 kW, PF 0.75 → 0.93
Source: Schneider Electric Electrical Installation Guide 2016, L8 (attached s1 p8); https://www.electrical-installation.org/enwiki/Theoretical_principles_to_improve_power_factor . Published 48 kvar uses rounded tan values 0.88 and 0.4. Full trigonometry gives 48.669 kvar; absolute tolerance 0.8 kvar covers that stated rounding, without changing the physics.
Inputs: Present displacement power factor = 0.75; Target displacement power factor = 0.93; Series reactor relative impedance = None · plain capacitors; the others as above.
| Result | Source | This calc |
|---|---|---|
| Ideal bank required | 48 ± 0.8 kVA | 48.669 kVA |
ABB paper 8 · 300 kW, PF 0.75 → 0.90
Source: ABB Technical Application Paper No.8, Power factor correction and harmonic filtering in electrical plants, printed p14: Qc = K · P = 0.398 · 300 = 119.4 kvar. https://library.e.abb.com/public/4704e67320c08992c1257870002e4700/1SDC007107G0202.pdf . Their tabulated K is rounded; exact trigonometry gives 119.278 kvar, within 0.15 kvar. The attached link is s3; publisher download blocked to scripts, example verified through indexed publisher text.
Inputs: Active input power = 300 kW; Present displacement power factor = 0.75; Target displacement power factor = 0.9; Series reactor relative impedance = None · plain capacitors; the others as above.
| Result | Source | This calc |
|---|---|---|
| Ideal bank required | 119.4 ± 0.15 kVA | 119.3 kVA |
Schneider L23 · 630 kVA, 6%, 350 kvar
Source: Schneider Electric Electrical Installation Guide 2016, L23 (s1 p23); https://www.electrical-installation.org/enwiki/Risk_of_resonance_due_to_power-system_harmonics . The stated 630 kVA / 0.06 gives 10.5 MVA, although the page rounds it to about 10 MVA. Its stated h = 5.5 and 275 Hz are consistent with 10.5 MVA: full precision gives 5.477 and 273.86 Hz. Using exactly 10 MVA would give 5.345, not 5.5; that inconsistency is not copied.
Inputs: Active input power = 500 kW; Present displacement power factor = 0.7; Bank sizing = Evaluate an entered bank; Entered net bank output at this bus = 350 kvar; Three-phase short-circuit power at bank bus = 10.5 MVA; Series reactor relative impedance = None · plain capacitors; the others as above.
| Result | Source | This calc |
|---|---|---|
| Bare-bank resonance order · screen only | 5.5 ± 0.03 | 5.477 |
| Hypothetical bare-bank parallel resonance frequency | 275 ± 1.2 Hz | 273.9 Hz |
Schneider L24 · 5.7% reactor at 50 Hz
Source: Schneider Electric Electrical Installation Guide 2016, L24 (s1 p24), Fig. L31: 5.7% → 4.2 order, 210 Hz at 50 Hz. Table values rounded; equations kept exact.
Inputs: Series reactor relative impedance = 5.7% · about 210 Hz at 50 Hz; the others as above.
| Result | Source | This calc |
|---|---|---|
| LC series tuning order | 4.2 ± 0.02 | 4.189 |
| Series tuning frequency | 210 ± 0.6 Hz | 209.4 Hz |
Schneider L24 · 7% reactor at 50 Hz
Source: Schneider Electric Electrical Installation Guide 2016, L24 (s1 p24), Fig. L31: 7% → 3.8 order, 190 Hz at 50 Hz. Full precision 3.7796 and 188.982 Hz; table rounds to engineering values.
Inputs: the default inputs above.
| Result | Source | This calc |
|---|---|---|
| LC series tuning order | 3.8 ± 0.03 | 3.78 |
| Series tuning frequency | 190 ± 1.1 Hz | 189 Hz |
Schneider L24 · 14% reactor at 60 Hz
Source: Schneider Electric Electrical Installation Guide 2016, L24 (s1 p24), Fig. L31: 14% → 2.7 order, 160 Hz at 60 Hz. Table values rounded.
Inputs: Series reactor relative impedance = 14% · about 134 Hz at 50 Hz; Supply frequency = 60 Hz; Lowest significant harmonic = 3rd · significant triplen voltage; the others as above.
| Result | Source | This calc |
|---|---|---|
| LC series tuning order | 2.7 ± 0.03 | 2.673 |
| Series tuning frequency | 160 ± 0.4 Hz | 160.4 Hz |
Related Resources
Related articles
Related courses
IEC Electrical Schematics and Industrial Control Panels
5
Original price was: 42 €.21 €Current price is: 21 €.
Basic Electrical Controls & Diagram Reading
7
Original price was: 32 €.18 €Current price is: 18 €.
Modeling Electrical Motor Faults with FEM Simulation using ANSYS MAXWELL
3
Original price was: 50 €.15 €Current price is: 15 €.







Responses