Multicolour Printing Cost: AMS vs Dual Nozzle vs Toolchanger

Compare filament, waste, printing hours and cost for AMS/MMU, dual nozzles, nozzle swaps and toolchangers. Edit dated scenarios and calculate cash or time-valued payback.

#AMS #break-even #dual-nozzle #flush-matrix #MMU #printing-cost #purge-waste #toolchanger

Compare multicolor 3D printing cost before buying another machine or committing to a production run. This AMS purge waste calculator estimates filament consumed, material discarded, occupied hours and operating cost for four architectures: a single shared nozzle, dual nozzles, a nozzle swapping system, and a full toolchanger. It is intended for engineers, students, makers and small print businesses comparing the same useful job.

Start with the mass and model-only printing time of one copy. Enter the number of identical copies on the plate, the layers carrying tower structure, and either changes per active layer or the total changes reported by your slicer. Copies share a colour-change schedule: batching increases useful output without automatically multiplying the purge count. The comparison tables report results for the complete plate and the cost per useful copy.

Colour changes are not all equal. The flush volume calculator uses a directional matrix: black to white can require more clearing than white to black. The initial A/B entries reproduce Prusa’s documented example; C and D, the frequency mix, and most machine settings are illustrative scenarios dated 27 October 2026. Enable the custom colour matrix to edit its entries and mix. For each architecture, choose Enter own values in the machine scenario selector to replace reload frequency, tower quantities, timing, average power, purchase quote and measurement date.

For dual-nozzle and hybrid machines, enter the share of changes that actually reload an occupied nozzle. This includes returning to a nozzle through another tool: simply counting transitions between different nozzle numbers misses some reloads. A two-colour job with one dedicated nozzle per colour can use zero reloads. With three or four colours the actual mapping and print order matter. The common matrix should represent the pairs flushed during those reloads; adjust each architecture’s multiplier or run separate scenarios when those mixes differ.

Tower priming is counted separately from clearing flush. A complete measured tower can replace the estimated prime and supporting structure, provided it excludes clearing material already counted elsewhere. Flush into infill or useful objects is capped by capacity already included in the model mass. It replaces ordinary extrusion; moving purge into an extra disposable object does not create a material saving.

The toolchanger vs AMS payback view distinguishes cash expenses from a calculation that also values released machine hours. Purchase costs are editable examples, not current offers. Read the payback interpretation when savings are zero, negative, or the toolchanger costs less initially. Annual totals repeat this job at the entered production rate; ownership curves add the purchase cost once.

This is a planning model, not a slicer or a vendor ranking. An H2C vs U1 waste comparison, for example, still needs matched profiles and a representative model. Firmware, colour pigments, tower behaviour and routing can change the answer. Failures, maintenance differences, drying energy, labour, resale value, tax, financing and discounting are excluded. Validate promising savings with a sliced file and a weighed test print.

How it is calculated

The comparison order is always AMS/MMU, dual nozzle, nozzle swap, full toolchanger. It describes architectures, not a ranking of models.

For active layers LmL_m and changes per active layer nln_l, N=LmnlN=L_m n_l, or enter an exact sliced change count. Directional relative frequencies wijw_{ij} give Vˉ=∑wijVij/∑wij\bar V=\sum w_{ij}V_{ij}/\sum w_{ij}. In additive mode, Vij=Ui+DjV_{ij}=U_i+D_j; direct mode accepts all 12 off-diagonal entries for four slots. A/B use Prusa's worked black/white example. C/D and equal transition frequencies are illustrative.

For architecture kk, reload share rkr_k and calibration factor fkf_k give gross clearing mass Fk=NrkfkVˉρF_k=N r_k f_k\bar V\rho. All volumes are explicitly converted to consistent units. Flush replacing useful material is Rk=min⁡(Fkp,mcapacity)R_k=\min(F_k p, m_{capacity}). Tower mass is Tk=NVprime,kρ+LtVstructure,kρT_k=N V_{prime,k}\rho+L_t V_{structure,k}\rho, or an entered complete tower mass. Fixed startup/brim mass is SkS_k. Total consumed is Mmodel+Fk−Rk+Tk+SkM_{model}+F_k-R_k+T_k+S_k. The material-balance residual is checked.

Weighted all-in change time is tk=(1−rk)tdedicated,k+rktreload,kt_k=(1-r_k)t_{dedicated,k}+r_k t_{reload,k}. Plate time adds model-only time with its machine multiplier, NtkN t_k, fixed setup time, and extrusion time for tower material outside the change allowance. That extra tower mass is max⁡(Tk−NVprime,kρ,0)\max(T_k-N V_{prime,k}\rho,0), so measured towers do not count priming time twice. No time reduction is credited for flush reuse: this is conservative when infill replaces an already timed purge.

Electricity is average wall power × total hours. Cash cost is filament + electricity. Valued cost adds occupied hours × the entered time rate. Annual totals multiply plate quantities by annual plates; ownership curves add purchase cost once. For a positive toolchanger premium and positive per-plate savings, whole-plate payback is ⌈ΔP/ΔC⌉\lceil\Delta P/\Delta C\rceil. A lower initial cost with higher running cost is identified separately and has no recovery-of-premium result.

Reference checks verify Prusa's two worked directional examples, CNC Kitchen's roughly 40 s inclusive H2C change cycle, and the independently reported Tom's Hardware frog material budget. These validate directional averaging, time conversion and material accounting; they do not establish predictive accuracy for every machine/profile.

Assumptions

  • Scenario date: 2026-10-27. Purchase amounts (600 / 1000 / 1600 / 2000 USD), 150 W average power, 6 min setup, tower structure 20 mm³/layer, 0.5 g fixed waste, equal base print speeds and dual reload share 33% are illustrative editable assumptions, not vendor specifications or measured product comparisons.
  • A 90 s shared-nozzle cycle is an illustrative midpoint of CNC Kitchen's reported 1–2 minute range. The nozzle-swap scenario uses its reported roughly 40 s inclusive cycle; 12 s for loaded tools is an illustrative point inside its 10–15 s range. The 45 mm³ separate prime is Orca's documented Type 2 example, not universal across profiles.
  • All-in change times already include change-associated flushing, priming, motion and heating. Sparse structure is added separately. Retune inclusive times when changing flush volumes. Startup mass and time are independent budgets.
  • Each architecture's reload percentage describes actual occupied-nozzle reloads, not colour count or a simple nozzle-crossing fraction. No automatic route optimization is attempted. Common matrix weights approximate its reload-pair mix; use per-machine calibration factors or separate runs for dissimilar mixes.
  • Density and price are blended effective values. Useful reuse capacity is material already budgeted inside model/support/object mass. The same capacity limit is applied independently to each candidate printer.
  • Identical copies share the colour schedule and tower. Model mass and model-only time scale with copies. Extra travel and geometric packing effects are excluded.
  • When using a purge-to-tower MMU workflow, count clearing material once: a measured tower must exclude its clearing fraction if the flush matrix already counts it. Separate prime volume is only extra pressure stabilization.
  • The colour-matrix custom switch must stay enabled to use its edits. Machine scenario selectors offer Enter own values for every numeric parameter and the measurement/firmware date; selecting the illustrative row restores that row.

Where it applies

Planning for 2–4 represented slots with nonnegative, calibrated budgets. Variable layer height is supported through actual layer and change counts, not geometric inference. Tower-supporting layers are independent of layers with colour changes and of total model layers. Enter 0 supporting layers or 0 structural volume to omit tower structure; per-change priming is still counted. A physical layer can have several changes.

A full toolchanger or nozzle-swap system can still flush if it has fewer dedicated loaded paths than colours: enter the actual reload share. XL, INDX, U1 and H2C firmware/mechanical implementations differ; these are architecture examples, not identical mechanisms or interchangeable factory profiles.

Colour cleanliness and inter-material strength are not predicted. Wipe-to-infill can contaminate light walls or incompatible materials. Determine safe volumes and reuse experimentally. Default power, purchase cost and tower structure are not measurements. Firmware/slicer revisions require remeasurement; record the revision alongside your local scenario.

Positive time-valued savings need usable released capacity. Set the time rate to zero or select cash basis for out-of-pocket payback. Annual production is demand, not automatically constrained by calendar availability; a capacity condition flags more than 8760 occupied hours on one machine. Zero annual plates has no finite payback in years. There is no finite recovery when a positive purchase premium meets zero or negative savings; the status explains this and numeric payback is blank.

The frog checks reproduce published accounting, with distinct sliced and weighed values. Their difference is real measurement uncertainty, not a reason to tune the predictive model. Failed prints, material-specific prices, dryers, extraction, labour, maintenance differences, financing, taxes, residual value and discounted cash flow are outside the model.

References

  • Prusa Knowledge Base, Purging volumes (MMU), worked black/white contributions 80/30 and 20/70 mm³; accessed 2026-10-27. https://help.prusa3d.com/article/purging-volumes-mmu_125097
  • CNC Kitchen, The H2C Review: Better Than a Toolchanger?, 2025-11-18: inclusive nozzle-change timing and comparison with loaded tool changes. https://www.cnckitchen.com/blog/the-h2c-review-better-than-a-toolchanger
  • OrcaSlicer official wiki, Prime Tower: fixed priming, Type 1/Type 2 differences and sparse structure; accessed 2026-10-27. https://github.com/OrcaSlicer/OrcaSlicer/wiki/multimaterial_settings_prime_tower
  • Tom's Hardware, Bambu Lab X1-Carbon 3D Printer review: frog slicer budget 28.46 g model, 86.99 g waste, 115.45 g total; weighed 28 g model and 96 g waste. https://www.tomshardware.com/3d-printing/bambu-lab-x1-carbon-3d-printer-review

Inputs

InputSymbolUnitDefault
Model and ordinary supports, per copy
Exclude flushed filament, towers and startup lines.
m_partg40
Identical copies on the same plate
Changes are shared across these copies. Assumes identical colour schedules and layer heights.
copies1
Model-only printing time, per copy
Exclude colour changes and tower printing. Per-machine speed multipliers are editable below.
t_parth2
Total tower-supporting layers
Layers carrying extra tower structure, independent of layers with colour changes. Enter 0 to omit structural tower volume; per-change priming is still counted.
layers250
Layers with colour changes
For the layer estimate only; include return-to-first-colour changes where they occur.
multi200
How to count changescount_modeChanges per layer × layers
Average changes per active layer
Count switches, not colours. Two colours can require one or two changes per layer.
chg_layer2
Total colour changes on this plate
Exclude the initial tool selection. Use the actual sliced count.
chg_total400
Colours represented by A, B, C, D
This model supports up to four colour/material slots. Slots beyond this count are ignored.
colours3
Weighted filament density
Illustrative PLA density. Use an extrusion-volume-weighted average for unlike materials.
rhog/cm^31.24
Blended filament price
Use the same currency throughout; USD labels are a convention, not a live price.
priceUSD/kg25
Electricity price
Enter your local tariff in the chosen currency.
tariffUSD/kWh0.2
Value of occupied machine time
Opportunity cost or maintenance allowance; exclude purchase depreciation already counted as capital.
rateUSD/h2
Plates of this job per year
Annual operating totals exclude purchase costs.
plates_year100
Payback and ownership chart use
Time has no cash value unless it releases productive capacity or avoids a real expense.
basisCash: filament + electricity
Compare the full toolchanger againstbaselineSingle nozzle · AMS/MMU
Requested share of flush routed into useful infill (%)
0–100. Applies to clearing flush only, never tower priming or startup waste.
reuse_pct0
Useful infill/support/object capacity, per copy
Material already included in model mass that can safely accept mixed filament. Extra sacrificial objects are waste unless useful.
capacityg0
Use custom colour matrix and transition mix
Keep enabled to apply custom values. Default mix: all six A/B/C directions equally frequent; D unused.
edit_pairsfalse
Flush matrix construction
A = black and B = white use Prusa's worked example, not a universal calibration. C and D are illustrative.
matrix_modeUnload + load contributions
A · unload contribution
From your purge calibration; additive matrix uses outgoing unload + incoming load.
uAmm^380
A · load contribution
This is extruded clearing volume, not raw filament feed length.
lAmm^330
B · unload contribution
From your purge calibration; additive matrix uses outgoing unload + incoming load.
uBmm^320
B · load contribution
This is extruded clearing volume, not raw filament feed length.
lBmm^370
C · unload contribution
From your purge calibration; additive matrix uses outgoing unload + incoming load.
uCmm^360
C · load contribution
This is extruded clearing volume, not raw filament feed length.
lCmm^350
D · unload contribution
From your purge calibration; additive matrix uses outgoing unload + incoming load.
uDmm^360
D · load contribution
This is extruded clearing volume, not raw filament feed length.
lDmm^350
A → B · clearing flush
Directional volume for a shared-nozzle reload, excluding any separate priming volume.
vABmm^3150
A → C · clearing flush
Directional volume for a shared-nozzle reload, excluding any separate priming volume.
vACmm^3130
A → D · clearing flush
Directional volume for a shared-nozzle reload, excluding any separate priming volume.
vADmm^3130
B → A · clearing flush
Directional volume for a shared-nozzle reload, excluding any separate priming volume.
vBAmm^350
B → C · clearing flush
Directional volume for a shared-nozzle reload, excluding any separate priming volume.
vBCmm^370
B → D · clearing flush
Directional volume for a shared-nozzle reload, excluding any separate priming volume.
vBDmm^370
C → A · clearing flush
Directional volume for a shared-nozzle reload, excluding any separate priming volume.
vCAmm^390
C → B · clearing flush
Directional volume for a shared-nozzle reload, excluding any separate priming volume.
vCBmm^3130
C → D · clearing flush
Directional volume for a shared-nozzle reload, excluding any separate priming volume.
vCDmm^3110
D → A · clearing flush
Directional volume for a shared-nozzle reload, excluding any separate priming volume.
vDAmm^390
D → B · clearing flush
Directional volume for a shared-nozzle reload, excluding any separate priming volume.
vDBmm^3130
D → C · clearing flush
Directional volume for a shared-nozzle reload, excluding any separate priming volume.
vDCmm^3110
A → B · relative frequency
Relative counts, normalized to the plate's total changes. Include only active slots. For hybrid machines use the mix of actual reload pairs.
wAB1
A → C · relative frequency
Relative counts, normalized to the plate's total changes. Include only active slots. For hybrid machines use the mix of actual reload pairs.
wAC1
A → D · relative frequency
Relative counts, normalized to the plate's total changes. Include only active slots. For hybrid machines use the mix of actual reload pairs.
wAD0
B → A · relative frequency
Relative counts, normalized to the plate's total changes. Include only active slots. For hybrid machines use the mix of actual reload pairs.
wBA1
B → C · relative frequency
Relative counts, normalized to the plate's total changes. Include only active slots. For hybrid machines use the mix of actual reload pairs.
wBC1
B → D · relative frequency
Relative counts, normalized to the plate's total changes. Include only active slots. For hybrid machines use the mix of actual reload pairs.
wBD0
C → A · relative frequency
Relative counts, normalized to the plate's total changes. Include only active slots. For hybrid machines use the mix of actual reload pairs.
wCA1
C → B · relative frequency
Relative counts, normalized to the plate's total changes. Include only active slots. For hybrid machines use the mix of actual reload pairs.
wCB1
C → D · relative frequency
Relative counts, normalized to the plate's total changes. Include only active slots. For hybrid machines use the mix of actual reload pairs.
wCD0
D → A · relative frequency
Relative counts, normalized to the plate's total changes. Include only active slots. For hybrid machines use the mix of actual reload pairs.
wDA0
D → B · relative frequency
Relative counts, normalized to the plate's total changes. Include only active slots. For hybrid machines use the mix of actual reload pairs.
wDB0
D → C · relative frequency
Relative counts, normalized to the plate's total changes. Include only active slots. For hybrid machines use the mix of actual reload pairs.
wDC0
Effective tower-structure extrusion rate
Used for skeleton printing only. Change times already include flushing and post-change priming.
q_towermm^3/s6
AMS/MMU · illustrative · 2026-10-27
All fields are editable through Enter own values. Change the date/firmware field when you remeasure. Costs and powers are examples, not live product data.
a_machineAMS/MMU · illustrative
Dual nozzle · illustrative · 2026-10-27
All fields are editable through Enter own values. Change the date/firmware field when you remeasure. Costs and powers are examples, not live product data.
b_machineDual nozzle · illustrative
Nozzle swap · illustrative · 2026-10-27
All fields are editable through Enter own values. Change the date/firmware field when you remeasure. Costs and powers are examples, not live product data.
c_machineNozzle swap · illustrative
Toolchanger · illustrative · 2026-10-27
All fields are editable through Enter own values. Change the date/firmware field when you remeasure. Costs and powers are examples, not live product data.
d_machineToolchanger · illustrative

Results

With the default inputs above, the calc gives:

ResultValue
Changes per plate400
AMS/MMU discarded per plate80.3 g
Full toolchanger discarded per plate29 g
Toolchanger cash saving / plate vs selected baseline1.54 USD
Toolchanger saving / plate with time valued18.87 USD
Hours released / plate vs selected baseline8.67 h
Annual savings on selected basis154.13 USD
Whole plates to recover toolchanger premium909
Years at entered annual production9.09
Payback interpretationPositive premium recovered through operating savings

Checked against sources

Each case below was calculated by this calc and agrees with the value from its source (within the tolerance where one is shown).

Prusa worked example · black to white

Source: Prusa Knowledge Base, Purging volumes (MMU), worked example: outgoing black 80 mm³ + incoming white 70 mm³ = 150 mm³. These are published illustrative calibration values, not measurements of every filament.

Inputs: Use custom colour matrix and transition mix = yes; Colours represented by A, B, C, D = 2; How to count changes = Total changes from slicer; Total colour changes on this plate = 1; A → C · relative frequency = 0; B → A · relative frequency = 0; B → C · relative frequency = 0; C → A · relative frequency = 0; C → B · relative frequency = 0; the others as above.

ResultSourceThis calc
Weighted clearing volume per shared-nozzle reload150 mm³150 mm³
Gross clearing flush before reuse [1]150 mm³150 mm³

Prusa worked example · white to black

Source: Prusa Knowledge Base, Purging volumes (MMU), reverse worked example: outgoing white 20 mm³ + incoming black 30 mm³ = 50 mm³. Checks matrix direction and the change-count convention.

Inputs: Use custom colour matrix and transition mix = yes; Colours represented by A, B, C, D = 2; How to count changes = Total changes from slicer; Total colour changes on this plate = 1; A → B · relative frequency = 0; A → C · relative frequency = 0; B → C · relative frequency = 0; C → A · relative frequency = 0; C → B · relative frequency = 0; the others as above.

ResultSourceThis calc
Weighted clearing volume per shared-nozzle reload50 mm³50 mm³
Gross clearing flush before reuse [1]50 mm³50 mm³

Independent frog test · published slicer accounting

Source: Tom's Hardware X1 Carbon review, frog test: published sliced model 28.46 g plus combined flushed/tower material 86.99 g, total 115.45 g. The complete measured-overhead input is used with zero separately modelled changes: this checks accounting, not a prediction of unknown change count or matrix.

Inputs: How to count changes = Total changes from slicer; Total colour changes on this plate = 0; Model and ordinary supports, per copy = 28.46 g; AMS/MMU · illustrative · 2026-10-27 = custom:{"reload":100,"flush":1,"prime":0,"sparse":20,"fixed":0,"tower_mode":"measured","tower_g":86.99,"change":90,"shared":90,"speed":1,"power":150,"capital":600,"setup":6,"asof":"2026-10-27"}; the others as above.

ResultSourceThis calc
Total filament consumed per plate [1]115.5 g115.4 g
Discarded material per plate [1]86.99 g86.99 g

Independent frog test · weighed material accounting

Source: Same first-hand Tom's Hardware test, separately weighed: frog 28 g and discarded material 96 g; expected 124 g is the arithmetic sum of these published measurements. This is a mass-accounting check. The 8.55 g difference from the sliced total is retained rather than tuning a model to erase it.

Inputs: How to count changes = Total changes from slicer; Total colour changes on this plate = 0; Model and ordinary supports, per copy = 28 g; AMS/MMU · illustrative · 2026-10-27 = custom:{"reload":100,"flush":1,"prime":0,"sparse":20,"fixed":0,"tower_mode":"measured","tower_g":96,"change":90,"shared":90,"speed":1,"power":150,"capital":600,"setup":6,"asof":"2026-10-27"}; the others as above.

ResultSourceThis calc
Total filament consumed per plate [1]124 g124 g
Discarded material per plate [1]96 g96 g

CNC Kitchen · one inclusive nozzle-change cycle

Source: CNC Kitchen, The H2C Review: Better Than a Toolchanger? (2025-11-18), reports around 40 s including purging. One representative nozzle-swap cycle is therefore 40/3600 h. This is a component check of inclusive timing and seconds-to-hours conversion, not a complete-print benchmark or a claim that firmware always takes exactly 40 s.

Inputs: How to count changes = Total changes from slicer; Total colour changes on this plate = 1; the others as above.

ResultSourceThis calc
Total change time [3]0.01111 h0.01111 h

Related Resources

Responses

Your email address will not be published. Required fields are marked *

L ading...