LPG Cylinder vs Induction Cooking Cost Calculator

Compare LPG and induction cooking for the same useful heat. Estimate cylinder life, monthly fuel costs and the extra electricity bill across tariff slabs.

#cooking costs #cylinder life #heat balance #induction cooking #LPG #slab tariffs #stove efficiency #subsidies

Use this LPG vs induction cost calculator to compare cooking fuel costs for the same useful heat. It serves households, students and engineers who want to estimate monthly spending, induction electricity demand and how long a gas cylinder lasts.

Start with Your prices. Enter the net price of your 14.2 kg refill after subsidy and the price of one more electricity unit. That electricity rate applies to every added cooking unit in the Constant rate results. If you know how many days a refill lasts, enter it; zero uses the cooking-demand estimate. The first results show the cheaper fuel, break-even electricity rate, cylinder-equivalent induction units and costs over 30 days.

Open Details for prices, billing, cooking demand, efficiencies and cylinder playback. Choose Snapshot / my tariff under Detailed comparison basis to use a historical country snapshot or your own tariff and cooking demand. Leave the basis at Your prices to keep the breakdown and pictures on the quick net refill price, constant electricity rate and optional observed cylinder days, without a second subsidy. Opening or closing Details does not change the calculation. Detailed results and extra charts appear after a detailed input changes; Show detailed results and charts also reveals them without changing the inputs.

Historical India, Nigeria and Kenya snapshots remain available. Delhi combines LPG prices from 12 March 2026 with BYPL base electricity slabs from February 2025. The PMUY option uses the quoted FY 2025–26 subsidy allowance. Nigeria combines the June 2025 national LPG average with Ikeja Band A electricity. Kenya combines March 2026 LPG prices with December 2024 DC3 electricity. These are dated scenarios, not live quotes or guarantees of eligibility.

For the detailed comparison, enter other household electricity use for the whole bill. Preset monthly allowances scale by billing days divided by 30, or by the utility billing factor you supply. Custom slab limits already cover the whole period. Kenya DC3 requires existing consumption above 100 kWh per tariff month and consumption with induction no greater than 15,000 kWh. Outside that range, enter a custom applicable tariff.

Cooking demand comes from useful heat per household session or cooking-only measured induction kWh. A session means preparing a whole household meal. The default heat demand is illustrative. The model divides useful heat by stove efficiency and converts LPG chemical energy to mass through its heating value. Use efficiencies and heating value on the same calorific basis.

Induction cooking electricity cost in the detailed model is the bill with cooking minus the bill without it. LPG cost covers fuel consumed with an annualized subsidy cap, rather than the timing of whole-cylinder purchases. Include relevant variable taxes and levies in custom rates; Delhi's preset excludes rebates, PPAC and taxes. For rebate cliffs or all-units repricing, use an effective incremental flat rate from two utility bill estimates.

Play the cylinder's first year of depletion, stopping sooner if it empties. The fill represents remaining mass schematically, not pressure or actual liquid height. The bill and cost curves show the detailed tariff calculation. Purchase cost, replacement cookware, outages, backup generation, ventilation and kitchen cooling are excluded. Gas and electrical installation work belongs to a qualified person.

How it is calculated

Your prices (14.2 kg, INR): useful heat in one refill is Qc=14.2HηgQ_c=14.2H\eta_g, with HH converted to kWh/kg. Equivalent induction electricity is Ec=Qc/ηiE_c=Q_c/\eta_i, and break-even electricity price is p∗=Pnet/Ecp_*=P_{net}/E_c. Enter the net price after subsidy once; no second subsidy deduction is made. With observed cylinder duration DD, 30-day LPG cost is 30Pnet/D30P_{net}/D and induction cost is 30Ecpe/D30E_cp_e/D. Saving is LPG cost minus induction cost, so a negative value favors LPG. If optional days is zero, use D=Qc/QdD=Q_c/Q_d from the cooking-demand model. Cylinder-equivalent electricity and break-even rate do not depend on days. The Your prices comparison basis applies this same 14.2 kg refill, net price, flat electricity rate and cylinder duration to the breakdown and pictures. Observed days set daily useful heat to Qc/DQ_c/D; without observed days, the session or meter demand applies. No additional subsidy is deducted. The Snapshot / my tariff basis uses the selected market, subsidy, tariff and detailed heat or meter demand; efficiencies, heating value and (when quick days is zero) daily useful heat are shared with the quick comparison. The Details fold and the display-only results checkbox never select a different scenario.

The comparison holds useful heat to the food constant: Qd=nQmealQ_d=n Q_{meal} per day in session mode. In measured-electricity mode, Qd=Emeterηi/TperiodQ_d=E_{meter}\eta_i/T_{period}; the reported induction bill then uses the original meter kWh, and LPG is the equal-heat alternative. Fuel inputs are Eg=Qd/ηgE_g=Q_d/\eta_g and Ei=Qd/ηiE_i=Q_d/\eta_i. With LPG heating value HH (lower-heating-value basis by default), daily mass is md=Eg/Hm_d=E_g/H and cylinder life is D=M/mdD=M/m_d. All energy conversions use explicit units; MECS eCAP, Table 7 (attached p.32), uses 46.1 MJ/kg, equal to 12.80556 kWh/kg.

Preset monthly electricity allowances are multiplied by ff: billing days divided by 30 in planning mode, or the utility billing factor entered in invoice mode. Thirty days is a planning convention, not a statutory calendar rule. Custom slab entries already describe the whole billing period and are not multiplied again. Kenya DC3 requires existing use above 100 kWh and with-cooking use at most 15,000 kWh per tariff month. The existing-use sweep starts just above 100f100f and ends no higher than 15000f−Ei15000f-E_i, so both bills stay in the same category. The electricity-bill curve includes the tariff breakpoints exactly.

For a progressive electricity tariff, the bill is the sum of each occupied slab's kWh times its rate. Cooking costs B(E0+Ei)−B(E0)B(E_0+E_i)-B(E_0), not the household's historical average price times cooking kWh. The next-unit result is the actual cost of the next 1 kWh before cooking; a separate calculated step gives the next 1 kWh after cooking. The bill sums occupied slab energy in kWh times its price in local currency/kWh, with no one-kWh normalization. The effective cooking rate is the extra bill divided directly by cooking energy; the break-even rate likewise divides LPG cost by induction energy. The cost of the next 1 kWh is an amount of money for that finite increment; it is not reported as an instantaneous marginal rate.

The 365-day annualized refill demand is Ny=365md/MN_y=365m_d/M. Annual subsidy is Sy=smin⁡(Ny,Ncap)S_y=s\min(N_y,N_{cap}), and average net refill price is P−Sy/NyP-S_y/N_y. Period LPG cost is consumed mass divided by refill mass, multiplied by this net price. This is a steady-use annual allowance model, not a forecast of payment dates or remaining eligibility.

MECS India's March 2026 review, printed p.36 / attached p.41, reports household iron-burner LPG efficiencies around 60–65%; 60% is the default. Frontier Energy's DOE-hosted cooktop analysis reports commercial gas boil tests around 25–40% and induction around 80–85%; 85% is the induction default. These are different tasks and populations. The calculator does not claim that a boil efficiency describes every meal. The default 0.45 kWh useful heat per household session is an editable scenario, not a measured universal meal.

Regression cases check implementation. Two WISIONS Table 14 cases (s11 p.34) use original meter readings and published worked outcomes. Since the report omits electric losses, reproduction uses induction efficiency 1; LPG displacement is worked, not independently measured. Its narrative's NPR 341 low-use maximum is gross; the table's NPR 258.94 net value is used.

Assumptions

  • Your prices always refers to a fully usable 14.2 kg LPG refill priced in Indian rupees after subsidy, irrespective of the market selected below. Its monthly comparison means 30 days, independent of the detailed billing-period length.
  • Your entered electricity rate applies to all induction units added in the quick comparison. Use the effective average incremental rate if those units cross a slab or a rebate threshold; the detailed model calculates progressive crossings explicitly.
  • Observed cylinder days represent the same household cooking task with unchanged LPG efficiency and no other gas uses. Zero means days are unknown: the monthly estimate then uses the detailed cooking demand. With the Your prices basis, these days also set the demand and depletion in the breakdown and pictures. With the Snapshot / my tariff basis, the detailed calculation retains its own demand.
  • Constant daily cooking demand; both alternatives deliver the same useful food heat with unchanged cooking technique.
  • Efficiencies and heating value use the same calorific basis; the default LPG basis is lower heating value. Losses include energy not delivered to food; they are not all retained as room heat.
  • A full, usable LPG refill has the stated net mass; no leakage, unusable residue or fuel sharing. The drawing's fill fraction is schematic mass, not actual liquid height or pressure.
  • With the Your prices basis, all costs are in Indian rupees. With the Snapshot / my tariff basis, detailed costs use the selected snapshot's currency, or the currency selected for custom prices. No exchange-rate comparison is made.
  • Preset monthly allowances and monthly eligibility thresholds use the selected billing factor: days/30 for planning, or the exact utility factor. Custom slab allowances are entered for the whole period. Five equal rates give a flat tariff. Fixed connection charges cancel only if the tariff category and connection stay unchanged.
  • No automatic electricity rebates, all-units repricing or lifeline-category changes. Kenya's DC3 preset requires existing use above 100 kWh per tariff month and with-cooking use no greater than 15,000 kWh per tariff month.
  • Nigeria and Kenya rows contain no separate household LPG subsidy deduction in this model. This does not assert that every consumer is ineligible for assistance.
  • LPG subsidy is annualized over 365 days. The PMUY example is the quoted FY 2025–26 provision of INR 300 per 14.2 kg refill for up to nine refills; it is not an assertion of today's eligibility.
  • Remaining LPG in the animation is clamped to zero; there are no automatic refills. Playback ends at the earlier of empty or 365 days; a longer cylinder life is still reported in full.
  • The Details fold is closed initially. Its fields remain active when folded, and opening or closing it never resets entries or changes values. The comparison basis defaults to Your prices. Detailed results and the three extra charts appear when a detailed field differs from its default or Show detailed results and charts is selected; the energy-flow drawing remains visible.
  • In measured-electricity mode, the meter total covers cooking only and the same billing period; induction efficiency converts it to useful heat for the LPG comparison.

Where it applies

The Your prices defaults are dated Delhi values: INR 913 per 14.2 kg refill (12 March 2026, no separate subsidy) and INR 3/kWh (BYPL February 2025 first base-energy slab, also the detailed default's next-unit rate). They are historical examples, not current quotes. With the Your prices basis, every cost and picture uses the quick constant rate for every added kWh. With the Snapshot / my tariff basis, the detailed slab-bill comparison can differ from the quick answer. Enter your applicable variable charges, taxes and levies; use the detailed tariff model when the next-unit price will change. The quick net price does not track annual subsidy caps, remaining entitlement, or a change of subsidy after switching fuels. No measured cylinder days is assumed at the defaults.

Use for comparative operating energy costs and cylinder endurance, not equipment sizing or guaranteed household bills. Planning periods use 30-day tariff months; select the utility's billing factor for a precise calendar bill. Custom limits must already cover the whole period. The supplied snapshots deliberately have different dates. India LPG: Delhi, 12 March 2026; India electricity: BYPL February 2025 base domestic slabs (200 / 400 / 800 / 1200 kWh at INR 3 / 4.5 / 6.5 / 7 / 8 per kWh). Electricity rebates, PPAC, taxes and surcharges are excluded from this preset, so its result is a base-energy comparison. Enter current effective incremental rates for a personal decision.

Nigeria: NBS national mean 5 kg refill NGN 8,323.95 in June 2025; NERC Ikeja Band A Non-MD NGN 209.50/kWh from June 2025, excluding any separately billed tax. A national fuel average is not an Ikeja supplier quote.

Kenya: KNBS March 2026 national mean 13 kg LPG refill KES 3,132.34; EPRA December 2024 DC3 all-in electricity KES 28.71/kWh (base 19.08 + pass-through 4.96 + taxes/levies 4.67). This mixed-date historical scenario must not be presented as a March 2026 complete utility tariff. DC3 eligibility uses existing whole-period kWh divided by the selected tariff-month factor. Both existing and with-cooking bills must remain in the DC3 range: existing monthly use above 100 kWh and with-cooking monthly use at most 15,000 kWh. This category range is given by EPRA's FY 2023–2024 report, p.19 (attached link s12). Outside it, enable custom prices and enter the tariff that applies. The Kenya sweeps are restricted to this category.

No electric-pressure-cooker savings are inferred from an induction efficiency. Cooking time, appliance wattage, standby, purchase cost, replacement cookware, capital payback, emissions, indoor air quality, outages and backup-fuel costs are excluded. Progressive custom slabs must increase in their energy limits; rates may rise or fall. For changing regulations or installations, check against the rules in force. Gas and electrical installation work belongs to a qualified person.

The cylinder player is explicitly a one-year window when calculated endurance exceeds 365 days; it does not imply the cylinder empties at that time. The cylinder-life result is not capped.

LCU is the local accounting unit: INR with Your prices, or the detailed snapshot's currency or your chosen custom currency. All detailed monetary steps and tariff rates use LCU and LCU/kWh consistently; numeric result cards and chart axes show the active currency. The INR quick price and rate enter through an explicit 1 LCU/INR denomination factor, used only in the INR branch. This preserves their values without comparing or exchanging currencies. Preset table amounts are already denominated in each row's local currency. Bills multiply energy by price directly; average and break-even rates divide cost by cooking energy. The next-1-kWh result is a cost for that finite increment, in currency units.

References

  • Frontier Energy, Induction Cooktop Analysis, DOE Better Buildings resource (published 8 Nov 2022), commercial water-boil efficiency discussion and Table 1: https://betterbuildingssolutioncenter.energy.gov/resources/frontier-energy-induction-cooktop-analysis ; report https://bbi.energy.gov/sites/default/files/attachments/Induction_Cooktop_Analysis_Report.pdf
  • MECS, A wide-ranging review of India's journey towards electric cooking (March 2026), printed p.36 / attached s1 p.41: https://mecs.org.uk/wp-content/uploads/2026/03/A-wide-ranging-review-of-Indias-journey-towards-electric-cooking-by-the-Modern-Energy-Cooking-Services-Programme.pdf
  • MECS, eCAP Appliance Comparison Report, Table 7, attached s2 p.32: https://mecs.org.uk/wp-content/uploads/2024/01/eCAP-Appliance-Comparison-Report.pdf
  • Government of India, MoPNG statement, 12 March 2026, Delhi domestic LPG INR 913, PMUY INR 613: https://www.pib.gov.in/PressReleasePage.aspx?PRID=2239021&lang=1&reg=3
  • Government of India, targeted subsidy FY 2025–26: INR 300 per 14.2 kg refill, up to nine refills: https://www.pib.gov.in/PressReleasePage.aspx?PRID=2210560&lang=1&reg=3
  • BSES Yamuna Power Ltd, Form 2.1a February 2025, domestic base energy slabs: https://www.bsesdelhi.com/documents/73527/1989278520/Form_2_1a_Feb_2025.pdf
  • Nigeria NBS, LPG Price Watch June 2025, executive summary p.4, attached s3 p.4: https://microdata.nigerianstat.gov.ng/index.php/catalog/160/download/1266
  • NERC, Ikeja June 2025 tariff order, Table 2 p.4: https://nerc.gov.ng/wp-content/uploads/2025/06/Ikeja-june-2025.pdf
  • Kenya KNBS, March 2026 Consumer Price Indices, Table 3, LPG 13 kg: https://www.knbs.or.ke/wp-content/uploads/2026/03/Kenya-Consumer-Price-Indices-and-Inflation-Rates-March-2026.pdf
  • Kenya EPRA, Bi-Annual Energy & Petroleum Statistics Report 2024/2025, Table 2.10, December 2024 DC3 all-in rate: https://www.epra.go.ke/sites/default/files/2025-03/Bi-Annual%20Energy%20%26%20Petroleum%20Statistics%20Report%202024_2025.pdf
  • WISIONS / PEEDA / Wuppertal Institute (2025), Nepal micro-enterprise e-cooking, Table 14 p.34: https://www.wisions.net/wp-content/uploads/2025/11/WISIONS-Reports_IL-Nepal_E-Cooking.pdf
  • EPRA, Energy & Petroleum Statistics Report FY 2023–2024, p.19, DC3 category bounds (review-supplied source): https://www.epra.go.ke/sites/default/files/2024-10/EPRA%20Energy%20and%20Petroleum%20Statistics%20Report%20FY%202023-2024_2.pdf

Inputs

InputSymbolUnitDefault
Net price of your 14.2 kg refill
After subsidy; Delhi default dated 12 March 2026.
quick_price₹913
Price of one more electricity unit
Applies to every added cooking unit.
quick_rate₹/kWh3
One cylinder lasts (optional)
0 uses the cooking demand in detailed settings.
quick_daysday0
Detailed comparison basis
Your prices uses optional cylinder days; Snapshot / my tariff uses the cooking demand below.
price_basisYour prices
Show detailed results and chartsshow_analysisfalse
Dated price snapshot
Historical snapshots; use custom prices for a current bill.
marketIndia — Delhi
Use my prices and electricity tariff
Overrides the dated snapshot in the detailed tariff comparison.
own_pricesfalse
Currency for my pricescurrency_customINR — Indian rupees
LPG refill mass
Net LPG mass, excluding the steel cylinder tare.
mass_customkg14.2
Gross refill price (local currency)
Before subsidy, including delivery if applicable.
price_customLCU913
Subsidy per eligible refill (local currency)sub_customLCU0
Eligible subsidized refills per year
Annualized allowance, not remaining entitlement; zero disables subsidy.
quota_custom9
Electricity tariff structure
Use an effective flat rate for all-units tariffs or rebate cliffs.
tariff_customProgressive slabs
First slab ends atb1_customkWh200
Second slab ends atb2_customkWh400
Third slab ends atb3_customkWh800
Fourth slab ends atb4_customkWh1200
Flat or first-slab price (currency/kWh)
Include variable taxes and levies.
r1_customLCU/kWh3
Slab 2 price (currency/kWh)r2_customLCU/kWh4.5
Slab 3 price (currency/kWh)r3_customLCU/kWh6.5
Slab 4 price (currency/kWh)r4_customLCU/kWh7
Slab 5 price (currency/kWh)r5_customLCU/kWh8
Electricity use without induction cooking
Other household kWh over the whole bill, excluding cooking.
E_basekWh180
Monthly tariff allowance basis
Use days / 30 for planning, or your utility's billing factor.
period_rule30-day planning month
Utility billing factor (months)
Number of monthly allowances in this bill.
invoice_factor1
Billing period length
Custom slab limits must cover this whole billing period.
days_periodday30
Cooking demand from
A cooking-only meter total can replace the useful-heat estimate.
demand_modeUseful heat per household session
Measured induction electricity in this period
Exclude unrelated household electricity use.
E_meterkWh47.65
Household cooking sessions per day
One session means preparing a whole household meal.
meals_day3
Useful heat per household session
Heat delivered to food, excluding stove losses.
Q_mealkWh0.45
LPG efficiency (fraction)
0.60 means 60%; match the stove, cookware and cooking task.
eta_g0.6
Induction efficiency (fraction)
0.85 means 85%; match the cookware and cooking task.
eta_i0.85
LPG heating value
Use heating value and efficiency on the same calorific basis.
H_lpgMJ/kg46.1
Day since filling (one-year window)
Playback covers the first year or until empty, whichever comes first.
day_elapsedday30

Results

With the default inputs above, the calc gives:

ResultValue
Constant rate: cheaper fuelInduction costs less
Constant rate: break-even electricity rate7.11 ₹/kWh
Constant rate: cylinder-equivalent electricity128.4 kWh
Constant rate: LPG per 30 days339 ₹
Constant rate: induction per 30 days143 ₹
Constant rate: induction saving per 30 days196 ₹
Detailed tariff: cylinder life80.8 day
Detailed tariff: LPG per bill338.9 {currency}
Detailed tariff: induction extra bill142.9 {currency}
Detailed tariff: induction saving (negative favors LPG)196 {currency}
Detailed tariff: cooking electricity per bill47.65 kWh
Detailed tariff: LPG per bill5.27 kg
Detailed tariff: cost of next 1 kWh3 {currency}
Detailed tariff: cooking average rate3 {currency}/kWh
Detailed tariff: break-even rate7.11 {currency}/kWh
Detailed tariff: average net refill price913 {currency}

Checked against sources

Each case below was calculated by this calc and agrees with the value from its source (within the tolerance where one is shown).

Regression: MECS Table 7: one kilogram LPG heat balance

Source: MECS eCAP Appliance Comparison Report, Table 7, attached p.32. Published LPG energy content 46.1 MJ/kg and kWh-to-MJ factor 3.6 give 12.80555556 kWh/kg by hand. For a normalized ideal balance (eta=1, not a claimed real stove), 12.80555556 kWh useful heat consumes 1 kg and a 14.2 kg fill lasts 14.2 days at that daily load. This tests conversion and mass balance, not field efficiency.

Inputs: Household cooking sessions per day = 1; Useful heat per household session = 12.806 kWh; LPG efficiency (fraction) = 1; Induction efficiency (fraction) = 1; Billing period length = 1 day; Electricity use without induction cooking = 0 kWh; Day since filling (one-year window) = 0 day; Detailed comparison basis = Snapshot / my tariff; the others as above.

ResultSourceThis calc
LPG energy per kilogram12.806 kWh/kg12.806 kWh/kg
Detailed tariff: LPG per bill1 kg1 kg
Detailed tariff: cylinder life14.2 day14.2 day

Regression: NBS June 2025: consume one 5 kg refill

Source: Nigeria NBS LPG Price Watch June 2025, executive summary attached p.4: independently collected national mean price NGN 8,323.95 for 5 kg. The diagnostic heat load is set by hand to 5 kg × (46.1/3.6) kWh/kg × 0.60 = 38.41666667 kWh in one day. Consuming exactly the quoted refill must cost the published amount. This artificial load is a calibration case, not a household meal estimate.

Inputs: Dated price snapshot = Nigeria — Ikeja Band A; Household cooking sessions per day = 1; Useful heat per household session = 38.417 kWh; Billing period length = 1 day; Day since filling (one-year window) = 0 day; Detailed comparison basis = Snapshot / my tariff; the others as above.

ResultSourceThis calc
Detailed tariff: LPG per bill5 kg5 kg
Detailed tariff: cylinder life1 day1 day
Detailed tariff: LPG per bill8,324 LCU8,324 LCU

Regression: Delhi monthly slabs, 180 to 230 kWh

Source: BYPL Form 2.1a February 2025 domestic schedule: first 200 kWh INR 3/kWh, 201–400 INR 4.50/kWh. Independent hand sum for 50 extra kWh on 180 existing kWh: 20×3 + 30×4.5 = INR 195. The diagnostic ideal-efficiency input over a 30-day month makes electricity 50 kWh exactly; it is not a stove-efficiency claim. Excludes Delhi electricity rebates and additions. https://www.bsesdelhi.com/documents/73527/1989278520/Form_2_1a_Feb_2025.pdf

Inputs: Household cooking sessions per day = 1; Useful heat per household session = 1.667 kWh; Induction efficiency (fraction) = 1; Day since filling (one-year window) = 0 day; Detailed comparison basis = Snapshot / my tariff; the others as above.

ResultSourceThis calc
Detailed tariff: induction extra bill195 LCU195 LCU
Detailed tariff: cost of next 1 kWh3 LCU3 LCU
Price of next 1 kWh after adding cooking4.5 LCU4.5 LCU
Detailed tariff: cooking average rate3.9 LCU/kWh3.9 LCU/kWh

Regression: PMUY FY 2025–26: cap the annual benefit

Source: Government of India FY 2025–26 subsidy provision: INR 300 per 14.2 kg cylinder for up to nine refills. Independent calculation: (6/0.60)/(46.1/3.6) = 0.7809110629 kg/day, so yearly refills exceed nine. Annual subsidy = 9×300 = INR 2,700. Period cost = (daily kg×30/14.2)×913 − 2700×30/365 = INR 1284.36064. Price snapshot is 12 March 2026; do not infer a later entitlement. https://www.pib.gov.in/PressReleasePage.aspx?PRID=2210560&lang=1&reg=3 ; https://www.pib.gov.in/PressReleasePage.aspx?PRID=2239021&lang=1&reg=3

Inputs: Dated price snapshot = India — Delhi PMUY; Useful heat per household session = 2 kWh; Day since filling (one-year window) = 0 day; Detailed comparison basis = Snapshot / my tariff; the others as above.

ResultSourceThis calc
Refills receiving the annual subsidy99
Total annualized LPG subsidy, selected currency2,700 LCU2,700 LCU
Detailed tariff: LPG per bill1,284 LCU1,284 LCU

Regression: EPRA DC3 December 2024: 200 added kWh

Source: EPRA Bi-Annual Energy & Petroleum Statistics Report 2024/2025, Table 2.10: December 2024 DC3 rate is 19.08 + 4.96 + 4.67 = KES 28.71/kWh. Independent bill increment at unchanged DC3 category: 200×28.71 = KES 5742. The large diagnostic heat demand normalizes electricity to 200 kWh and is not a typical household meal. https://www.epra.go.ke/sites/default/files/2025-03/Bi-Annual%20Energy%20%26%20Petroleum%20Statistics%20Report%202024_2025.pdf

Inputs: Dated price snapshot = Kenya — DC3 (>100 kWh); Household cooking sessions per day = 2; Useful heat per household session = 85 kWh; Billing period length = 1 day; Day since filling (one-year window) = 0 day; Detailed comparison basis = Snapshot / my tariff; the others as above.

ResultSourceThis calc
Detailed tariff: cooking electricity per bill200 kWh200 kWh
Detailed tariff: induction extra bill5,742 LCU5,742 LCU
Detailed tariff: cooking average rate28.71 LCU/kWh28.71 LCU/kWh

Regression: two identical Delhi PMUY months retain the verdict

Source: Reviewer regression using the BYPL monthly domestic slab schedule. Two identical 30-day months each have 180 kWh other use and 47.64705882 kWh cooking: each incremental energy bill is INR 184.4117647. At the same daily demand, the combined 60-day bill must be twice that, INR 368.8235294, and the monthly allowances must double. This is a period-scaling regression, not independent field validation. https://www.bsesdelhi.com/documents/73527/1989278520/Form_2_1a_Feb_2025.pdf

Inputs: Dated price snapshot = India — Delhi PMUY; Billing period length = 60 day; Electricity use without induction cooking = 360 kWh; Detailed comparison basis = Snapshot / my tariff; the others as above.

ResultSourceThis calc
Electricity slab 1 upper limit for this period400 kWh400 kWh
Detailed tariff: induction extra bill368.8 LCU368.8 LCU
Detailed tariff: LPG per bill455.1 LCU455.1 LCU

Published worked case: Nepal low-use hotel (Table 14)

Source: WISIONS/PEEDA/Wuppertal (2025), Table 14, p.34. Original inputs: 16.48 kWh/month, NPR 5/kWh, 14.2 kg refill NPR 2000, LPG 13.6 kWh/kg at 50% efficiency. Published: 2.42 kg displaced, NPR 341.34 gas, 82.40 electricity, 258.94 net. LCU=NPR; eta_i=1 reproduces the report's omitted electric losses.

Inputs: Cooking demand from = Measured induction electricity; Use my prices and electricity tariff = yes; Currency for my prices = LCU — other local currency; Gross refill price (local currency) = 2,000 LCU; Electricity tariff structure = Flat variable rate; Flat or first-slab price (currency/kWh) = 5 LCU/kWh; Electricity use without induction cooking = 0 kWh; LPG heating value = 48.96 MJ/kg; LPG efficiency (fraction) = 0.5; Induction efficiency (fraction) = 1; Day since filling (one-year window) = 0 day; Measured induction electricity in this period = 16.48 kWh; Detailed comparison basis = Snapshot / my tariff; the others as above.

ResultSourceThis calc
Detailed tariff: LPG per bill2.42 ± 0.005 kg2.424 kg
Detailed tariff: LPG per bill341.3 LCU341.3 LCU
Detailed tariff: induction extra bill82.4 LCU82.4 LCU
Detailed tariff: induction saving (negative favors LPG)258.9 LCU258.9 LCU

Published worked case: Nepal high-use hotel (Table 14)

Source: Same publication, Table 14, p.34: original high-use input 138.83 kWh/month; otherwise unchanged source assumptions. Published: 20.42 kg displaced, NPR 2875.52 gas, 694.15 electricity, 2181.37 net. LCU=NPR; eta_i=1 is an ideal calculation boundary, not a measured efficiency.

Inputs: Cooking demand from = Measured induction electricity; Use my prices and electricity tariff = yes; Currency for my prices = LCU — other local currency; Gross refill price (local currency) = 2,000 LCU; Electricity tariff structure = Flat variable rate; Flat or first-slab price (currency/kWh) = 5 LCU/kWh; Electricity use without induction cooking = 0 kWh; LPG heating value = 48.96 MJ/kg; LPG efficiency (fraction) = 0.5; Induction efficiency (fraction) = 1; Day since filling (one-year window) = 0 day; Measured induction electricity in this period = 138.8 kWh; Detailed comparison basis = Snapshot / my tariff; the others as above.

ResultSourceThis calc
Detailed tariff: LPG per bill20.42 kg20.416 kg
Detailed tariff: LPG per bill2,876 LCU2,876 LCU
Detailed tariff: induction extra bill694.2 LCU694.2 LCU
Detailed tariff: induction saving (negative favors LPG)2,181 LCU2,181 LCU

Related Resources

Responses

Your email address will not be published. Required fields are marked *

L ading...