Heat Pump Running Cost Calculator

Estimate heat-pump electricity from climate and flow temperature or a supplied JAZ. Compare gas, oil and kerosene costs with dated German tariffs and carbon-price scenarios.

#§14a EnWG #climate-bin method #CO₂ pricing #gas comparison #heat pump #JAZ #running costs

Estimate annual heat-pump electricity use and compare running costs with a gas boiler, light heating oil boiler or kerosene heater delivering the same useful heat. This heat pump vs gas cost calculator also supports rural liquid-fuel comparisons for engineers, students, homeowners and energy advisers.

Start with annual useful space heat and hot-water heat at the generator outlet, including downstream losses the generator must cover. A fuel bill measures purchased energy, not useful heat. Multiply billed gas energy by a realistic seasonal efficiency before entering equivalent heat demand. For a room-only kerosene comparison, set hot-water heat to zero and compare the same heated space and comfort level.

Choose the climate-bin estimate or supply a whole-system JAZ. The air-to-water estimate distributes annual heat across published European outdoor-temperature bins, using a 15 °C heating limit, weather compensation and a calibrated temperature-lift COP approximation. Enter the design flow temperature once; its unit menu accepts °C, °F or K with the correct offset. Set the A7/W35 COP, seasonal correction, backup heat share, hot-water COP and additional auxiliary electricity.

Four BWP reports benchmark one Vaillant aroTHERM plus VWL 75/6 at −10 °C outdoor design and 35/28, 45/38, 55/48 and 60/53 °C flow/return. The bin estimate is 8–14% below those space-heating JAZ results; checks use a declared ±15% screening band. This is not certified SCOP or a general accuracy guarantee. Warmer and colder climates remain unvalidated extrapolations. A model-specific BWP JAZ Rechner result or measured annual JAZ is preferable for decisions. A supplied JAZ replaces the entire estimate, including backup and auxiliaries. Users seeking a Wärmepumpe Stromkosten Rechner can compare planning scenarios with meter readings on the same energy boundary.

Select the comparison fuel. Gas efficiency uses billed gross-calorific kWh. Oil and kerosene efficiency use net-calorific energy, converted to litres using EBeV standard fuel properties. Condensing efficiency may exceed 1.00 on this basis; enter actual seasonal performance rather than a catalogue rating. Enter delivered litre prices and annual service costs. These are screening presets, not specific appliance ratings. Kerosene users in Japan can enter local quotations converted consistently into EUR and select Other country and Quoted tariff; German carbon charges and §14a benefits are excluded there.

Replace illustrative prices with dated offers. Electricity €0.25/kWh comes from a May 2025 worked example. Gas €0.10/kWh, liquid fuel €1.10/litre and service allowances are scenarios dated 25 October 2026. Use a final quoted electricity tariff unless contractual §14a pass-through is confirmed. Module 1 deducts an allocated customer credit; Module 2 assumes the full 60% network energy-charge reduction reaches the bill.

Choose a dated carbon scenario: the 2026 statutory €55–65/t auction corridor; the same 2027 corridor proposed by the cabinet on 12 August 2026; or an entered EU ETS2 market-price assumption from 2028, delayed from 2027. The Bundestag reports passing the bill on 15 October 2026; enactment is not confirmed here. Future prices are scenarios, not forecasts. An inclusive fuel quote stays fixed when the certificate price changes. To test carbon-price effects, use a genuinely CO₂-excluded base quote and add the charge once.

Results show annual costs, signed savings, consumption, system JAZ and a feasible break-even electricity price. Capital costs, subsidies, PV, financing, dynamic tariffs and legal compliance are excluded. Installation and electrical work belong to qualified persons.

How it is calculated

Use public EU 206/2012 Annex II Table 1 temperature-bin hours H_j. The outdoor design points are −10, +2 and −22 °C for the average, warmer and colder profiles. The heating limit is fixed at 15 °C, matching the BWP benchmark input; this is an author building assumption rather than the EU product-rating 16 °C load line. Relative load is L_j = max(15 − T_j, 0)/(15 − T_design). Heat shares w_j = H_j L_j / Σ(H_j L_j) conserve the entered annual useful space heat. The weather curve runs from 25 °C water at the heating limit to the entered design flow. The three reference weather profiles are scenarios, not postcode forecasts.

The COP approximation remains the original derived Carnot temperature-lift model: COP_j = clamp[COP_ref × (T_water,j + 273.15)/308.15 × 28/(T_water,j − T_j) × f_perf, 1, 8]. The 25 °C endpoint, 1–8 bounds and f_perf = 0.90 default are declared assumptions, not coefficients fitted to BWP outputs. Estimated compressor/fan seasonal space-heating COP = 1/Σ(w_j/COP_j). It is not a certified EN 14825 SCOP.

Numerical BWP benchmark, downloaded 25 October 2026. Attached reports s9–s12 use Vaillant aroTHERM plus VWL 75/6 A 230V (S2), BWP model 5058; COP A−7/A2/A7 at W35 = 2.80/4.10/4.80; 15 °C heating limit; −10 °C design outdoor; monovalent; one unit; no hot water or supplementary heater. The reference reports follow VDI 4650 Blatt 1:2024-02. No standard tables are reproduced.

Design flow / return (°C)BWP heating JAZBin estimateDeviation
35 / 284.734.33−8.4%
45 / 384.283.73−12.8%
55 / 483.823.29−13.8%
60 / 533.613.12−13.7%

The comparison uses generator-outlet space heat over compressor/fan electricity, with Q_water = 0, resistance heat = 0 and additional auxiliaries = 0. The model uses the design outlet temperature as a sink proxy; the benchmark's 7 K return-temperature spread is an implicit boundary condition, not an independently modelled variable. EU bin weather and VDI weighting differ. The observed bias is reported without correcting the COP coefficients. Reference checks accept a declared ±15% screening band for this four-case envelope only; this is not a general uncertainty guarantee.

Whole-system electricity = Q_space(1 − f_res)/SCOP_on + Q_space f_res + Q_water/COP_water + E_aux. Whole-system JAZ is total useful heat divided by this electricity. Supplied-JAZ mode replaces this entire expression, avoiding duplicate backup and auxiliary charges.

Heat-pump cost = electricity × effective customer energy price + fixed/service costs − allocated customer Module 1 credit. Separate §14a calculation requires confirmed contractual pass-through. Module 2 assumes the full 60% reduction of the undiscounted network energy charge reaches the customer. Module 1 is the amount actually credited, limited by eligible network charges and allocated once. Unconfirmed or partial pass-through uses a final quoted customer tariff instead.

Selected fuel input energy = useful heat / seasonal efficiency. Gas uses gross-basis efficiency and billed kWh. EBeV 2030 Annex 2 Part 4 (s5 p18) gives 3.2508 GJ/MWh × 0.0558 t/GJ = 0.18139464 kg CO₂ per billed gross-calorific kWh. Carbon cost receives VAT and is added only to a CO₂-excluded quote.

Light heating oil and kerosene use net-basis efficiency. EBeV 2030 Annex 2 Part 4 (s5 p18) gives densities 0.845 and 0.8 kg/l respectively, net calorific value 42.8 MJ/kg for both, and direct CO₂ factors 0.074 and 0.0733 t/GJ respectively. Net energy per litre = density × calorific value, explicitly converted into kWh/l; annual litres = purchased net kWh / kWh per litre. These give about 10.046 and 9.511 kWh/l, and 2.676 and 2.510 kg CO₂/l. Annual fuel cost = number of billed kWh or litres × quoted price + selected service allowance + any additional carbon charge. Dividing physical quantities by one kWh, litre or metric tonne gives dimensionless billing counts; currency strings are display labels.

Carbon-period selection changes the interpretation of the editable certificate price. 2026 uses the statutory auction corridor; 2027 is the dated cabinet-corridor scenario (€55–65/t); 2028+ uses an entered ETS2 market-price scenario. None is a forecast of retail energy prices. Local inclusive-quote mode sets the allocated German carbon price to zero. Changing a carbon price does not alter a CO₂-inclusive fuel quote; to model a carbon-driven price change, enter a carbon-excluded base quote and select the surcharge. A price is never added twice.

The unconstrained break-even electricity price is tested against €0.01–1.00/kWh, the Module 2 network-component floor, and the nonnegative allocated-bill constraint before display. Invalid chart points are deliberate gaps wherever allocated Module 1 credit exceeds energy plus fixed costs; those negative bills are not plotted.

Net-calorific (Hi) efficiency may exceed 1.00 because recovered condensation heat is absent from the Hi denominator. Buderus Logano plus, attached s16 pp18–19, illustrates standard utilization ratings up to 104% Hi versus 98% Hs. Those ratings establish the energy-basis distinction; they are not installed seasonal measurements.

Assumptions

Heat demand remains as entered when climate or efficiency changes. The reference climate distributes annual heat across bins; it does not size equipment or calculate a capacity deficit. The 15 °C heating limit and linear water-temperature curve assume weather compensation. Resistance heat share, hot-water COP and extra auxiliaries are supplied scenarios. COP_ref alone cannot describe every manufacturer's performance curve.

Use matching heat and electricity boundaries. Useful heat includes downstream distribution and storage losses to be covered at the generator outlet. Only auxiliaries outside the tested COP boundary are added. A supplied system JAZ includes all entered heat, backup and electricity. Boiler efficiency uses billed gross-calorific kWh; gas-boiler auxiliary electricity belongs in the gas fixed/service allowance.

All currency is EUR; the metric/US switch changes physical display units, not currencies. Local foreign-currency quotes must first be converted consistently into EUR. Prices and credits include VAT except the carbon certificate price, to which the entered VAT multiplier applies. Electricity €0.25/kWh is a historical May 2025 worked-example price. Gas €0.10/kWh, heat-pump service/fixed €200/year and gas service/fixed €300/year are illustrative assumptions set 2026-10-25. Module 1 €175/year is a BWP 2026 network example, not a guaranteed customer saving. Enter only the amount actually passed to you under your contract. Module 2 requires confirmation that its full network energy-charge reduction is passed through in addition to the entered price. Partial or unknown pass-through must use quoted-tariff mode.

Light heating oil and kerosene use EBeV 2030 Annex 2 Part 4 standard net fuel properties, not a fuel supplier's batch analysis. Liquid-heater net-basis efficiency 0.85, delivered price €1.10/litre and annual service/fixed allowance €300 are illustrative scenarios set 2026-10-25, shared by the two liquid presets. Change them for the appliance and offer. A room-only kerosene heater does not supply the entered hot-water demand: use zero hot water unless a matching kerosene system covers it. Equal useful heat assumes equal heated area and comfort; required ventilation losses must already be in that demand.

Native temperature editing stores one flow temperature in °C and converts °F or K with the offset. German carbon pricing and §14a are jurisdiction-specific. For Japan or another local market, select the local inclusive-quote option and enter all prices in EUR at a common exchange-rate date. This mode assigns no German carbon charge; it does not remove taxes already included in a local quote.

Liquid efficiency permits 0.40–1.07 on the net-calorific basis. The 1.07 screening ceiling is an author-selected envelope rounded upward from the illustrative gross/net energy ratio 104/98 ≈ 1.061 implied by Buderus's paired ratings; it is not a manufacturer seasonal-efficiency claim or a universal fuel-property limit. Enter actual seasonal efficiency and losses for your system. All carbon-period options except Other country represent German cases, including the future German ETS2 scenario. Other country requires a final quoted electricity tariff and excludes both German §14a modules.

Where it applies

Rules and prices snapshot: 25 October 2026. The approximation is for preliminary air-to-water cost screening, not equipment selection or a certified JAZ. The numerical benchmark covers one named model, 35–60 °C design flow, a 7 K flow/return spread, 15 °C heating limit, average reference climate with −10 °C design outdoor, COP_ref 4.8, and f_perf 0.90. Its 8–14% low bias versus BWP and the ±15% comparison band apply to those four cases only. Other COP curves, warmer/colder climates, different hydraulic spreads and hot-water performance are not validated by those cases. Use the model-specific BWP result or a measured system JAZ for a decision. Check against the standard in force for any formal EN 14825 SCOP or VDI 4650 determination.

The input envelope permits design flow 35–60 °C, COP_ref 2–6, seasonal correction 0.5–1.0, resistance heat fraction 0–0.5 and hot-water COP 1–6; these bounds prevent numerical misuse and do not extend the benchmark's accuracy claim. Frost, refrigerant properties, capacity modulation, detailed hydraulics and local weather are not resolved.

German §14a eligibility and supplier pass-through are separate questions. BNetzA guidance states that the network determination does not itself oblige suppliers to pass reductions to customers under existing contracts. Both separate Module 1 and Module 2 calculations require confirmation from the supply contract. Module 1 uses the credit actually passed to the customer, allocated once. Module 2 assumes full pass-through of the 60% network energy-charge reduction and confirmed separate metering. If unconfirmed, partial, or already included, enter the final customer price in quoted-tariff mode. Module 3 requires a defensible time-weighted final quote and is outside this flat-price model.

The break-even price is shown only if all selected-tariff price constraints can be met. Negative mathematical bills arising from overallocated credit are omitted from the JAZ curve. Installation and electrical work belong to qualified persons.

Dated carbon scenarios, checked 25 October 2026. BEHG §10 specifies a 2026 €55–65/t auction corridor, not a universal cap on supplier procurement costs or retail carbon pass-through. €60/t is a scenario midpoint. The cabinet decision of 12 August 2026 proposed extending that corridor to 2027 (BMUKN s13). The Bundestag reports passing the amended bill on 15 October 2026 (s14). The 2027 option retains the dated proposal as a scenario; this tool does not assert completed enactment or entry into force. EU ETS2 operation is scheduled from 2028, delayed from 2027 (European Commission s15). Any entered 2028+ price is a sensitivity scenario, not a forecast or statutory ceiling; the reserve's price trigger is not a hard price cap. The VAT multiplier and actual supplier pass-through remain user assumptions.

Oil and kerosene properties are statutory standard proxies; seasonal efficiency and delivered prices are appliance- and location-dependent. Net-basis efficiency above 1.00 is allowed for condensation within the 0.40–1.07 input envelope; do not use a catalogue standard utilization rating as evidence of actual seasonal performance. Direct emissions exclude upstream fuel production. Kerosene room-heater comparison requires the same heated area and comfort boundary, with ventilation heat losses included in useful heat; set hot-water heat to zero unless the comparison system actually provides it. Other country mode requires Quoted tariff and excludes both German carbon charges and §14a discounts, including for Japan. GModG/GEG compliance, subsidies, capital costs, lifetime economics, PV and future price forecasts are excluded.

References

  • BWP JAZ-Rechner, model-specific benchmark for object-level planning; accessed 2026-10-25. https://www.waermepumpe.de/werkzeuge/jaz-rechner/
  • EU Commission Regulation 206/2012 (6 March 2012), Annex II Tables 1 and 3: reference heating climate bins and design temperatures. Public legislation, not a standards-table reproduction. https://eur-lex.europa.eu/eli/reg/2012/206/oj/eng
  • Vaillant aroTHERM plus technical data: published A7/W35 COP 4.8 used only as the default calibration input. https://www.vaillant.sk/produkty/arotherm-plus/
  • Viessmann, Wärmepumpe Kosten: independent annual electricity/cost examples; electricity tariff dated May 2025. https://www.viessmann.de/de/wissen/technik-und-systeme/waermepumpe/waermepumpe-kosten.html
  • BNetzA, Integration von steuerbaren Verbrauchseinrichtungen, §14a Modules 1–3; rules checked 2026-10-25. https://www.bundesnetzagentur.de/DE/Vportal/Energie/SteuerbareVBE/start.html
  • BWP Praxisratgeber §14a, 2026 edition, pp6–7: illustrative annual Module 1 allowance and Module 2 worked savings. https://www.waermepumpe.de/fileadmin/user_upload/Praxisratgeber__14a_2026_WEB.pdf
  • BEHG §10: 2026 €55–65/t auction corridor; checked 2026-10-25. https://www.gesetze-im-internet.de/behg/__10.html
  • EBeV 2030 Annex 2 Part 4, natural-gas conversion and emissions constants (attached PDF p18). https://www.gesetze-im-internet.de/ebev_2030/EBeV_2030.pdf
  • BWP numerical reports generated 2026-10-25, attached s9–s12: Vaillant aroTHERM plus VWL 75/6 A 230V (S2), model id 5058, 15 °C heating limit, −10 °C design outdoor, monovalent, no DHW; flow/return 35/28, 45/38, 55/48 and 60/53 °C; heating JAZ 4.73, 4.28, 3.82, 3.61. Each report contains its full reproducible inputs and follows VDI 4650 Blatt 1:2024-02. https://www.waermepumpe.de/werkzeuge/jaz-rechner/
  • BMUKN, third BEHG amendment proposal: cabinet decision 12 August 2026; proposed €55–65/t corridor in 2027. https://www.bundesumweltministerium.de/gesetz/referentenentwurf-eines-dritten-gesetzes-zur-aenderung-des-brennstoffemissions-handelsgesetzes
  • Deutscher Bundestag, reports passage of amended BEHG bill on 15 October 2026; accessed 25 October 2026. Parliamentary passage is distinguished here from enactment and entry into force. https://www.bundestag.de/dokumente/textarchiv/2026/kw39-de-brennstoffemissionshandelsgesetz-1211312
  • European Commission, ETS2: operation from 2028 and market-based allowance pricing; checked 25 October 2026. Entered prices are scenarios, not forecasts. https://climate.ec.europa.eu/areas-action/carbon-markets/ets2-buildings-road-transport-and-additional-sectors_en
  • EBeV 2030 Annex 2 Part 4, attached s5 p18, kerosene and light heating oil standard density, net calorific value and direct COâ‚‚ factors. https://www.gesetze-im-internet.de/ebev_2030/EBeV_2030.pdf
  • Buderus, Logano plus GB125/GB225 brochure, attached s16 pp18–19: standard utilization ratings up to 104% on net calorific value (Hi) versus 98% on gross (Hs), and the explanation of condensation. Accessed 2026-10-25. https://www.buderus.lu/resource/blob/78778/300bcdf18330b3739bd37ecb0b7e17e3/logano-plus-gb125-bis-49kw-data.pdf

Inputs

InputSymbolUnitDefault
Efficiency method
Bin estimate uses design flow temperature and a reference climate. Supplied JAZ uses your measured or BWP whole-system annual value on the same boundary as the entered heat demand. A product COP or SCOP is not a measured system JAZ.
eff_modeBin estimate
Annual useful space heat
Annual heat delivered by the heat generator for space heating, including downstream distribution losses. Do not enter the gas-meter kWh unchanged. Enter MWh per year: 1 MWh = 1000 kWh.
Q_space_MWhMWh15
Annual useful hot-water heat
Heat required at the generator for domestic hot water, including cylinder and circulation losses. Use zero if outside the comparison. Enter MWh per year: 1 MWh = 1000 kWh.
Q_water_MWhMWh2.5
Whole-system annual JAZ
Includes space heat, hot water, resistance heating and all auxiliaries. No additional electricity is added in this mode.
JAZ_given3.5
Reference heating climate
EU reference profiles: Average design outdoor −10 °C (14 °F), Warm +2 °C (35.6 °F), Cold −22 °C (−7.6 °F). These are not postcode-specific weather. Annual heat demand stays as entered when climate changes.
climateAverage (−10°C)
Design flow temperature
Flow temperature at the climate design point. Use the unit menu to enter °C, °F or K; the stored temperature and results remain the same. Validated design-flow range: 35–60 °C (95–140 °F).
flow_C°C45
Declared COP at A7/W35
Tested COP at 7 °C air / 35 °C water. Default 4.8 matches the BWP benchmark Vaillant VWL 75/6. Four matched space-heating cases underpredict BWP by 8–14%; this is a coarse screening estimate, not model-specific certification. Range 2–6.
COP_ref4.8
Additional seasonal performance factor
Illustrative 0.90 multiplier for cycling, defrost and other departures from the simple temperature-lift model. It is an assumption, not a universal measured correction.
f_perf0.9
Space heat supplied by resistance heater
Heat share, not electricity share: 0.02 means 2%. This scenario input is not a sizing or bivalence calculation.
f_res0.02
Hot-water seasonal COP
Separate seasonal value for hot-water production, including any hot-water resistance heating.
COP_water2.5
Additional annual auxiliary electricity
Electricity outside the COP boundary, such as controls, external circulation and standby. Avoid counting pumps already included in the tested COP twice.
E_auxkWh150
Electricity tariff treatment
Quoted tariff is the final customer price with discounts included. German §14a Module 1 subtracts an annual customer credit; Module 2 reduces the network energy charge by 60%. Both require contractual pass-through. Other country mode requires Quoted tariff.
tariffQuoted tariff
Electricity energy price incl. VAT
Default is the May 2025 price in the published Viessmann examples, retained as an editable scenario on 25 Oct 2026. For Modules 1/2 enter the price before that module's discount.
p_e€/kWh0.25
Annual heat-pump fixed and service costs
Enter attributable supply/meter/control fees and maintenance. Exclude household standing charges that continue anyway. In Module 2 do not include a network standing charge.
F_hp€/a200
Undiscounted network energy charge incl. VAT
Only this component is reduced by 60%. Use the same VAT basis as the electricity energy price.
p_grid€/kWh0.1
Separate metering and §14a eligibility confirmed
Module 2 requires separate metering and acceptance under §14a. Confirm with the network operator.
meter_oktrue
Annual credit actually passed to you
Enter only the VAT-inclusive amount your supplier actually credits under the supply contract, allocated to this heat-pump comparison. €175 is BWP's 2026 illustrative network reduction, not a guaranteed customer saving. Do not deduct a credit already included in your quote.
R_m1€/a175
Annual network charges available for Module 1 credit
Credit is capped by actual network charges at the market location. Enter the full eligible meter's annual charges before credit, including household use if shared.
R_cap€/a1000
Supplier pass-through confirmed in contract
Confirm that the supply contract passes the entered Module 1 credit, or the full Module 2 network energy-charge reduction, to you in addition to the price entered here. Otherwise select quoted-tariff mode.
pass_contractfalse
Comparison heater preset
Choose the fuel delivering the same useful space and hot-water heat as the heat pump. Gas uses billed gross-calorific kWh; light heating oil and kerosene use litres and net-calorific efficiency. Defaults are illustrative scenarios, not current retail offers.
fuelGas boiler
Gas boiler seasonal efficiency, gross basis
Useful heat divided by billed gross-calorific gas kWh. Do not use an efficiency quoted above 100% on a net-calorific basis.
eta_g0.9
Gas energy price incl. VAT
Illustrative €0.10/kWh scenario set 25 Oct 2026, not a market average. State below whether this quote already includes CO₂.
p_g€/kWh0.1
Annual gas fixed and service costs
Supply/meter standing charge, maintenance and chimney sweep costs avoided if gas heating is removed. Include gas-boiler auxiliary electricity here.
F_gas€/a300
Liquid-heater seasonal efficiency, net basis
Useful heat divided by net-calorific fuel energy (Hi). Condensing systems may exceed 1.00 on this basis; the screening range is 0.40–1.07. Use actual seasonal performance on the same heat boundary, not a catalogue rating. The default 0.85 is illustrative. Buderus lists up to 1.04 Hi versus 0.98 Hs as standard utilization ratings, not a guarantee of installed seasonal efficiency. Room-only kerosene heating normally requires zero hot-water heat.
eta_liquid0.85
Delivered liquid-fuel price incl. VAT
Price per litre, including delivery and applicable taxes. €1.10/l is an illustrative oil/kerosene scenario dated 25 Oct 2026, not a market quote. For a Japan comparison, convert your local litre and electricity quotes into EUR on the same exchange-rate date.
p_liquidEUR/l1.1
Annual liquid-heater fixed and service costs
Illustrative €300/year allowance dated 25 Oct 2026. Include maintenance, tank/chimney costs and auxiliary electricity; enter the actual annual allowance for the chosen heater.
F_liquidEUR/year300
Carbon price period and jurisdiction
Germany 2026 uses the statutory €55–65/t auction corridor. Germany 2027 uses the same corridor proposed by the cabinet on 12 Aug 2026; Bundestag passage was reported on 15 Oct, but enactment is not confirmed here. ETS2 (2028+) is a future German price scenario, delayed from 2027; its market price is unknown. Other country uses local inclusive prices and requires Quoted tariff, with no German carbon charge or §14a discount.
carbon_periodGermany 2026
COâ‚‚ treatment of selected fuel quote
For gas, oil or kerosene. An inclusive quote is held fixed: the carbon component is an allocation, not another charge. For future price scenarios, enter a COâ‚‚-excluded base quote and choose the add option; do not add COâ‚‚ twice.
gas_co2COâ‚‚ included
Carbon scenario certificate price
Net price per metric tonne. €60/t is an editable midpoint for the 2026 auction corridor and proposed 2027 corridor (€55–65/t). For 2028+ ETS2 enter your own sensitivity price; €60/t is not an ETS2 forecast, floor or cap.
p_carbon€/t60
VAT multiplier on carbon charge
1.19 represents German 19% VAT. Quotes and running costs include VAT; the certificate price is net. Set the applicable rate for your scenario.
vat_g1.19

Results

With the default inputs above, the calc gives:

ResultValue
Heat-pump annual running cost1,547 EUR/year
Comparison fuel annual running cost2,244 EUR/year
Annual heat-pump saving (− = comparison fuel cheaper)697 EUR/year
Heat-pump electricity per year5,388 kWh
Whole-system annual JAZ3.25
Break-even electricity price before §14a€0.379 / kWh
Fuel CO₂ component — included or added as selected252 EUR/year
Annual comparison-fuel consumption19444 kWh/year (gross gas)
Carbon policy and price scenario status2026 BEHG auction corridor €55–65/t; checked 25 Oct 2026. €60/t is a scenario midpoint.

Checked against sources

Each case below was calculated by this calc and agrees with the value from its source (within the tolerance where one is shown).

Viessmann worked example: 15,000 kWh heat, JAZ 3

Source: Viessmann, Wärmepumpe Kosten, operating-cost worked example 1, energy price dated May 2025. Published heat 15,000 kWh, JAZ 3, electricity 5,000 kWh and €1,250/year at €0.25/kWh. Only the annual values are checked; the page rounds the monthly value to €105. https://www.viessmann.de/de/wissen/technik-und-systeme/waermepumpe/waermepumpe-kosten.html

Inputs: Efficiency method = Supplied JAZ; Annual heat-pump fixed and service costs = 0 €/a; Whole-system annual JAZ = 3; Annual useful hot-water heat = 0 MWh; the others as above.

ResultSourceThis calc
Heat-pump electricity per year5,000 kWh5,000 kWh
Heat-pump annual running cost1,250 EUR/year1,250 EUR/year

Viessmann worked example: 10,000 kWh heat, JAZ 4

Source: Viessmann, Wärmepumpe Kosten, operating-cost worked example 2, May 2025 tariff. Published 10,000 kWh heat / JAZ 4 = 2,500 kWh and €625/year. https://www.viessmann.de/de/wissen/technik-und-systeme/waermepumpe/waermepumpe-kosten.html

Inputs: Efficiency method = Supplied JAZ; Annual heat-pump fixed and service costs = 0 €/a; Whole-system annual JAZ = 4; Annual useful space heat = 10 MWh; Annual useful hot-water heat = 0 MWh; the others as above.

ResultSourceThis calc
Heat-pump electricity per year2,500 kWh2,500 kWh
Heat-pump annual running cost625 EUR/year625 EUR/year

BWP 2026 Module 2: 6,500 kWh and €0.10/kWh network charge

Source: BWP Praxisratgeber §14a (2026), attached s7 p7. Published independent result €390/year from 6,500 kWh/year and €0.10/kWh network charge. Heat/JAZ inputs are chosen to impose the published electricity use; this checks the tariff arithmetic, not JAZ prediction. https://www.waermepumpe.de/fileadmin/user_upload/Praxisratgeber__14a_2026_WEB.pdf

Inputs: Efficiency method = Supplied JAZ; Whole-system annual JAZ = 4; Electricity tariff treatment = §14a Module 2; Electricity energy price incl. VAT = 0.3 €/kWh; Supplier pass-through confirmed in contract = yes; Annual useful space heat = 26 MWh; Annual useful hot-water heat = 0 MWh; the others as above.

ResultSourceThis calc
Heat-pump electricity per year6,500 kWh6,500 kWh
Annual Module 2 saving on network energy charges390 EUR/year390 EUR/year

Official gas emissions conversion on billed gross kWh

Source: EBeV 2030 Annex 2 Part 4, natural gas row, attached s5 p18: conversion 3.2508 GJ/MWh and emissions 0.0558 t/GJ give 0.18139464 kg per billed gross-calorific kWh. This checks the unit-basis conversion of the independent statutory constants. https://www.gesetze-im-internet.de/ebev_2030/EBeV_2030.pdf

Inputs: the default inputs above.

ResultSourceThis calc
COâ‚‚ per billed gas kWh0.1814 kg/kWh0.1814 kg/kWh

Published average climate hours

Source: EU Regulation 206/2012, Annex II Table 1, total reference heating-season bin hours. These independent published totals check transcription of all bins. https://eur-lex.europa.eu/eli/reg/2012/206/oj/eng

Inputs: the default inputs above.

ResultSourceThis calc
Reference heating-season hours4,910 h4,910 h

Published warmer climate hours

Source: EU Regulation 206/2012, Annex II Table 1, total reference heating-season bin hours. These independent published totals check transcription of all bins. https://eur-lex.europa.eu/eli/reg/2012/206/oj/eng

Inputs: Reference heating climate = Warm (+2°C); the others as above.

ResultSourceThis calc
Reference heating-season hours3,590 h3,590 h

Published colder climate hours

Source: EU Regulation 206/2012, Annex II Table 1, total reference heating-season bin hours. These independent published totals check transcription of all bins. https://eur-lex.europa.eu/eli/reg/2012/206/oj/eng

Inputs: Reference heating climate = Cold (−22°C); the others as above.

ResultSourceThis calc
Reference heating-season hours6,446 h6,446 h

BWP VWL 75/6 space-heating benchmark, 35/28 °C (±15% screening band)

Source: BWP report RJZ202610250723-6DD4A5123FDDDF7F (s9 pp1–2), 2026-10-25. Vaillant aroTHERM plus VWL 75/6 A 230V (S2), model 5058, COP A−7/A2/A7 at W35 = 2.80/4.10/4.80. Heating limit 15 °C, design outdoor −10 °C, flow/return 35/28 °C, monovalent, one unit, no DHW/backup. Compare generator-outlet space heat / compressor-fan electricity; extra auxiliaries zero. 15000 kWh is scale only. Return spread 7 K is implicit: bin model resolves outlet only; EU bin weather differs from VDI weighting. Original COP coefficients unchanged; result 4.331 (-8.4%). Tolerance is the declared ±15% screening envelope, not exact VDI agreement or general accuracy; see notes.method for limits. https://www.waermepumpe.de/werkzeuge/jaz-rechner/

Inputs: Design flow temperature = 35 °C; Space heat supplied by resistance heater = 0; Additional annual auxiliary electricity = 0 kWh; Annual useful hot-water heat = 0 MWh; the others as above.

ResultSourceThis calc
Estimated compressor-only seasonal space-heating COP4.73 ± 0.70954.331

BWP VWL 75/6 space-heating benchmark, 45/38 °C (±15% screening band)

Source: BWP report RJZ202610250723-84B9AE3E7559546A (s10 pp1–2), 2026-10-25. Vaillant aroTHERM plus VWL 75/6 A 230V (S2), model 5058, COP A−7/A2/A7 at W35 = 2.80/4.10/4.80. Heating limit 15 °C, design outdoor −10 °C, flow/return 45/38 °C, monovalent, one unit, no DHW/backup. Compare generator-outlet space heat / compressor-fan electricity; extra auxiliaries zero. 15000 kWh is scale only. Return spread 7 K is implicit: bin model resolves outlet only; EU bin weather differs from VDI weighting. Original COP coefficients unchanged; result 3.733 (-12.8%). Tolerance is the declared ±15% screening envelope, not exact VDI agreement or general accuracy; see notes.method for limits. https://www.waermepumpe.de/werkzeuge/jaz-rechner/

Inputs: Space heat supplied by resistance heater = 0; Additional annual auxiliary electricity = 0 kWh; Annual useful hot-water heat = 0 MWh; the others as above.

ResultSourceThis calc
Estimated compressor-only seasonal space-heating COP4.28 ± 0.6423.733

BWP VWL 75/6 space-heating benchmark, 55/48 °C (±15% screening band)

Source: BWP report RJZ202610250723-115E06A2E6DC9C87 (s11 pp1–2), 2026-10-25. Vaillant aroTHERM plus VWL 75/6 A 230V (S2), model 5058, COP A−7/A2/A7 at W35 = 2.80/4.10/4.80. Heating limit 15 °C, design outdoor −10 °C, flow/return 55/48 °C, monovalent, one unit, no DHW/backup. Compare generator-outlet space heat / compressor-fan electricity; extra auxiliaries zero. 15000 kWh is scale only. Return spread 7 K is implicit: bin model resolves outlet only; EU bin weather differs from VDI weighting. Original COP coefficients unchanged; result 3.294 (-13.8%). Tolerance is the declared ±15% screening envelope, not exact VDI agreement or general accuracy; see notes.method for limits. https://www.waermepumpe.de/werkzeuge/jaz-rechner/

Inputs: Design flow temperature = 55 °C; Space heat supplied by resistance heater = 0; Additional annual auxiliary electricity = 0 kWh; Annual useful hot-water heat = 0 MWh; the others as above.

ResultSourceThis calc
Estimated compressor-only seasonal space-heating COP3.82 ± 0.5733.294

BWP VWL 75/6 space-heating benchmark, 60/53 °C (±15% screening band)

Source: BWP report RJZ202610250723-C0B49323FF2AD8AB (s12 pp1–2), 2026-10-25. Vaillant aroTHERM plus VWL 75/6 A 230V (S2), model 5058, COP A−7/A2/A7 at W35 = 2.80/4.10/4.80. Heating limit 15 °C, design outdoor −10 °C, flow/return 60/53 °C, monovalent, one unit, no DHW/backup. Compare generator-outlet space heat / compressor-fan electricity; extra auxiliaries zero. 15000 kWh is scale only. Return spread 7 K is implicit: bin model resolves outlet only; EU bin weather differs from VDI weighting. Original COP coefficients unchanged; result 3.115 (-13.7%). Tolerance is the declared ±15% screening envelope, not exact VDI agreement or general accuracy; see notes.method for limits. https://www.waermepumpe.de/werkzeuge/jaz-rechner/

Inputs: Design flow temperature = 60 °C; Space heat supplied by resistance heater = 0; Additional annual auxiliary electricity = 0 kWh; Annual useful hot-water heat = 0 MWh; the others as above.

ResultSourceThis calc
Estimated compressor-only seasonal space-heating COP3.61 ± 0.54153.115