Cooling towers replace water lost by evaporation, drift and controlled blowdown. This cooling tower makeup water calculation helps facility engineers, operators and students estimate those flows, compare cycles of concentration and explore a calcium carbonate scaling constraint. Use it for a steady operating condition in the evaporative water circuit of an open tower or the spray circuit of a closed-circuit unit.
Enter recirculating water flow, hot and cold water temperatures, and entering-air wet-bulb temperature. Flow fields accept explicit units, such as 1000 gal/min (US gallons). Rate cards show both m³/h and US gpm; use the SI/US switch for temperatures and volumes. The cooling range is hot minus cold water; approach is cold water minus wet bulb. In estimate mode, evaporation follows the SPX planning approximation of 0.0008 times circulating flow times range in °F, equivalent to 0.00144 per kelvin. For operating decisions, select the known-rate option and use a measured balance or a manufacturer’s detailed evaporation estimate. Weather, humidity and sensible heat transfer can make actual evaporation differ substantially.
Enter drift as a percentage of circulating flow, then choose requested and baseline cycles. Evaporation leaves dissolved salts behind; drift droplets and blowdown carry circulating-water salts out. The calculator therefore uses total liquid discharge equal to evaporation divided by cycles minus one, and subtracts drift to find cooling tower blowdown. A negative required blowdown means the selected cycles cannot be maintained with that drift rate. It is an input error rather than a zero-blowdown operating solution. Both water-demand curves stop at the drift-compatible ceiling, one plus evaporation divided by drift. The chart marks that boundary when it lies in view, and a result card gives its value; zero drift imposes no such ceiling.
For the scaling screen, enter makeup TDS, calcium hardness and alkalinity. Both hardness and alkalinity must be reported as CaCO₃. Enter circulating-water pH and the hottest relevant wetted temperature. The Langelier saturation index is evaluated assuming these constituents concentrate without precipitation or chemical addition. The tool caps requested cycles at the lowest of the selected LSI ceiling, your separately established site ceiling and its own TDS scope boundary. The default LSI allowance and site ceiling are illustrative assumptions, not approved operating limits.
Positive LSI indicates calcium carbonate supersaturation; it does not quantify scale mass or prove a treatment program effective. Negative LSI does not establish a corrosion rate. Review silica, chloride, sulphate, materials, inhibitors and microbial control separately. The charts show diminishing water savings and rising LSI as cycles increase; portions beyond your screening ceiling are exploratory.
Volumes apply the entered rates over the entered hours. Compare equivalent loads, and sum separate periods for seasonal operation. At fixed evaporation and negligible drift, increasing cycles from three to six cuts makeup by 20% and blowdown by 60%. DOE BMP #10 gives the same makeup saving but quotes 50% blowdown; the equations and published SPX balances support 60% under those assumptions.
This tool does not solve the Merkel heat-and-mass-transfer integral, size fill or fans, certify approach, prescribe chemical doses, or assess Legionella safety. Use its balance alongside measured chemistry, a specialist-approved treatment program and the site’s water management plan.
How it is calculated
For a steady basin inventory, makeup . A conservative dissolved-solids balance gives , so cycles . Combining these balances gives
Drift is concentrated liquid, not pure evaporated water. The implemented balance follows SPX Evaporation and Water Usage (2019), PDF p. 3.
Cooling range is and approach is . These describe boundary conditions used in Merkel's evaporative cooling framework; this tool does not evaluate the Merkel integral. Estimated evaporation uses with and in the same volume/time units and range in K. This is SPX Cooling Tower Fundamentals, 2nd ed. (2009), printed p. 31 / PDF p. 32: 0.0008 per °F of range. Select a known evaporation rate when better operating data are available.
The simplified Langelier screen follows WRC TT 874/2/21 (2022), PDF pp. 81 and 97:
Here , , , and . Concentrations are numerical mg/L; calcium hardness and alkalinity are as CaCO₃. The steps normalize dimensional values by 1 mg/L or 1 K before taking logarithms. This implementation uses the SI offset 273.15 K; WRC's worked example uses the rounded 273.2, changing its LSI by less than 0.001.
Holding circulating pH and temperature fixed while all three concentrations multiply by gives . Therefore . Used cycles are the minimum of the request, that ceiling, the entered site ceiling and . No usable solution is shown if the combined chemistry ceiling is at or below 1.01 or required blowdown is negative. Baseline cycles remain unchanged for the comparison. Volumes equal rate times operating hours.
For positive drift, setting blowdown to zero gives the drift-only cycles ceiling . Both water-demand curves are omitted where their implied blowdown is negative. A vertical line marks when it falls within the plotted cycles range; the result card also gives this ceiling. It is a hydraulic feasibility boundary, separate from the chemistry screen. With zero drift there is no finite drift-only ceiling.
Assumptions
- Steady operation, a well-mixed basin and approximately equal liquid densities. The circulation rate and thermal duty represent one operating condition.
- Evaporated water contains no dissolved solids; drift and blowdown have the circulating-water concentration. Leaks, overflow, rain, airborne salt loading and other withdrawals are excluded.
- TDS, calcium hardness and alkalinity concentrate conservatively. No precipitation, acid feed, softening or inhibitor chemistry is simulated. Circulating pH is entered independently and stays fixed across the sweep; it is not multiplied by cycles.
- The hottest relevant wetted temperature is supplied by the user. Heat-exchanger surface temperatures can exceed bulk hot-water temperature.
- The default +0.5 LSI allowance permits supersaturation. It and the default site limit of 6 cycles are illustrative, not safety recommendations.
- Savings compare identical evaporation, drift and operating hours. Negative savings mean increased water use.
- Flow-rate cards are provided in both m³/h and US gal/min. Flow inputs accept typed compatible units. The SI/US viewer switch changes absolute temperatures and operating volumes; temperature differences remain in K.
Where it applies
A planning balance for evaporative freshwater circuits, with an approximate calcium carbonate screen restricted here to pH 6.5–9.5, screening temperatures 1–90°C and projected TDS no greater than 10,000 mg/L. These are calculator scope limits, not a guarantee of accuracy or acceptable water quality. Strongly saline water, unusual buffers, treatment-altered alkalinity and chemically reactive species require a fuller chemistry model.
LSI describes thermodynamic calcium carbonate saturation, not scale quantity, deposition rate, overall corrosivity, silica scaling or microbial risk. A separate site ceiling must address other constituents, materials and treatment capability. Positive approach only checks the entered temperatures; it does not prove a tower can meet them. Range and approach are reported without fill sizing, air-flow calculation, fan selection or a Merkel-number calculation.
The SPX evaporation coefficient is an approximate operating estimate; ambient humidity and sensible heat transfer change actual evaporation. Prefer measured or manufacturer-calculated evaporation for operational decisions. Hours at one duty do not predict a seasonal load profile. Charts beyond the chemistry screening ceiling are hypothetical. Both water-demand curves omit negative-blowdown operating points; the vertical drift-limit marker denotes zero blowdown. No point to its right is a feasible steady balance at the entered evaporation and drift.
DOE BMP #10 quotes 20% less makeup and 50% less blowdown for 3 to 6 cycles. The makeup claim agrees with the fixed-evaporation balance; with negligible drift the blowdown reduction is 60%, since becomes . The calculator retains this balance.
References
- U.S. DOE FEMP, Best Management Practice #10: Cooling Tower Management, accessed 2026-10-29. https://www.energy.gov/cmei/femp/best-management-practice-10-cooling-tower-management
- SPX Cooling Technologies, Evaporation and Water Usage, AE-AS-24, September 2019, PDF p. 3, Table 1 and Eq. 1. https://spxcooling.com/wp-content/uploads/AE-AS-24-1.pdf
- SPX Cooling Technologies, J. C. Hensley (ed.), Cooling Tower Fundamentals, 2nd edition, 2009, Section I, printed pp. 14–16 and 31. https://spxcooling.com/pdf/Cooling-Tower-Fundamentals.pdf
- P. Moodley et al., Risk-based and Site-specific Industrial Use Water Quality Guidelines, Volume 2: Technical Support, WRC TT 874/2/21, March 2022, printed pp. 62, 68 and 78 (PDF pp. 81, 87 and 97). https://www.wrc.org.za/wp-content/uploads/mdocs/TT%20874%20Volume%202%20final%20web.pdf
- W. F. Langelier, The Analytical Control of Anti-Corrosion Water Treatment, Journal AWWA 28 (1936), 1500–1521. https://doi.org/10.1002/j.1551-8833.1936.tb13785.x
- F. Merkel, Verdunstungskühlung, Forschungsarbeiten auf dem Gebiete des Ingenieurwesens, Heft 275, VDI-Verlag, 1925. Historical thermal framework; no Merkel integral is implemented. Bibliographic record: https://ci.nii.ac.jp/ncid/BA86352898
- CDC, Controlling Legionella in Cooling Towers, January 3, 2025, accessed 2026-10-29. https://www.cdc.gov/control-legionella/php/toolkit/cooling-towers-module.html
Inputs
| Input | Symbol | Unit | Default |
|---|---|---|---|
| Recirculating water flow Flow through the evaporative water circuit at the operating condition. You may type a compatible unit after the number, for example 1000 gal/min; gal means US gallons. | R_water | m^3/h | 1000 |
| Hot water entering tower | T_hot | °C | 35 |
| Cold water leaving tower | T_cold | °C | 27 |
| Entering air wet-bulb temperature Use the coincident entering-air wet bulb. Range and approach describe the entered duty; they do not predict tower capacity. | T_wb | °C | 23 |
| Evaporation basis | evap_mode | Estimate from flow and range | |
| Known evaporation rate From a measured balance or a manufacturer/psychrometric model at this duty. Do not enter total makeup here. You may type a compatible unit after the number, for example 1000 gal/min; gal means US gallons. | E_known | m^3/h | 11.52 |
| Drift (% of circulating flow) Enter a percentage: 0.005 means 0.005%, not a fraction of 0.005. Use the eliminator's operating drift rate. | drift_pct | 0.005 | |
| Requested cycles of concentration Results use the lower of this request and the chemistry screening ceilings. | N_request | 4 | |
| Baseline cycles for comparison An existing operating point, used unchanged for the comparison. Its chemistry is checked separately. | N_base | 3 | |
| Hours at this operating condition Volume = rate × entered hours. For a variable load, calculate and sum separate operating periods. | t_run | h | 4000 |
| Makeup total dissolved solids | TDS_make | mg/L | 180 |
| Makeup calcium hardness (as CaCO₃) Calcium hardness, not total hardness and not elemental calcium. If the lab reports mg/L Ca, multiply by about 2.497 first. | Ca_make | mg/L | 30 |
| Makeup alkalinity (as CaCO₃) Use the carbonate/bicarbonate alkalinity appropriate to the water. Acid addition and noncarbonate buffers invalidate simple concentration. | Alk_make | mg/L | 30 |
| Circulating-water pH at screening temperature Use measured or treatment-predicted circulating pH. It is held fixed across the cycles sweep; makeup pH is not concentrated. | pH_circ | 7.7 | |
| Hottest wetted temperature for LSI screen Use the hottest relevant wetted surface or water temperature, at least the tower hot-water temperature. A bulk-water value can miss heat-exchanger scaling. | T_scale | °C | 40 |
| Selected maximum LSI A scenario limit, not a universal safe value. +0.5 is an illustrative allowance and already indicates supersaturation; agree the value with your water treatment specialist. | LSI_limit | 0.5 | |
| Site maximum cycles from other limits Enter an independently approved ceiling covering silica, chlorides, materials and treatment. The default 6 is illustrative and is not a site assessment. | N_site | 6 |
Results
With the default inputs above, the calc gives:
| Result | Value |
|---|---|
| Makeup water required | 15.36 m³/h |
| Makeup — US gpm | 67.628 gal/min |
| Blowdown required | 3.79 m³/h |
| Blowdown — US gpm | 16.687 gal/min |
| Evaporation | 11.52 m³/h |
| Evaporation — US gpm | 50.721 gal/min |
| Drift | 0.05 m³/h |
| Drift — US gpm | 0.22 gal/min |
| Cycles used after screening | 4 |
| Combined screening ceiling (cycles) | 5.99 |
| Drift ceiling (cycles; B = 0) | 231.4 |
| LSI at screening temperature | 0.17 |
| Cooling range | 8 K |
| Wet-bulb approach | 4 K |
| Makeup over entered operating hours | 61,440 m³ |
| Blowdown over entered operating hours | 15,160 m³ |
| Makeup volume saved versus baseline | 7,680 m³ |
| Makeup reduction versus baseline (%) | 11.11 |
Checked against sources
Each case below was calculated by this calc and agrees with the value from its source (within the tolerance where one is shown).
SPX Table 1: high drift replaces blowdown
Source: SPX Evaporation and Water Usage, AE-AS-24 (2019), PDF p. 3, Table 1 case 1. Published US gpm converted to m³/h using 1 US gal = 0.003785411784 m³. Evaporation is supplied by the source; this case tests the solids and water balance.
Inputs: Recirculating water flow = 4,542 m³/h; Hot water entering tower = 40.556 °C; Cold water leaving tower = 29.444 °C; Entering air wet-bulb temperature = 25.556 °C; Hottest wetted temperature for LSI screen = 45 °C; Evaporation basis = Enter evaporation rate; Known evaporation rate = 88.352 m³/h; Drift (% of circulating flow) = 0.2; Requested cycles of concentration = 3; the others as above.
| Result | Source | This calc |
|---|---|---|
| Drift | 9.085 m³/h | 9.085 m³/h |
| Blowdown required | 35.091 m³/h | 35.091 m³/h |
| Makeup water required | 132.5 m³/h | 132.5 m³/h |
| Makeup — US gpm | 583.5 gal/min | 583.5 gal/min |
SPX Table 1: efficient drift eliminators
Source: SPX Evaporation and Water Usage (2019), PDF p. 3, Table 1 case 2. Same duty and evaporation as case 1; reducing drift changes blowdown while makeup remains 583.5 US gpm.
Inputs: Recirculating water flow = 4,542 m³/h; Hot water entering tower = 40.556 °C; Cold water leaving tower = 29.444 °C; Entering air wet-bulb temperature = 25.556 °C; Hottest wetted temperature for LSI screen = 45 °C; Evaporation basis = Enter evaporation rate; Known evaporation rate = 88.352 m³/h; Requested cycles of concentration = 3; the others as above.
| Result | Source | This calc |
|---|---|---|
| Drift | 0.2271 m³/h | 0.2271 m³/h |
| Blowdown required | 43.949 m³/h | 43.949 m³/h |
| Makeup water required | 132.5 m³/h | 132.5 m³/h |
| Makeup — US gpm | 583.5 gal/min | 583.5 gal/min |
SPX Fundamentals: evaporation and blowdown worked example
Source: SPX Cooling Tower Fundamentals, 2nd edition (2009), printed p. 31 / PDF p. 32: 10,000 US gpm, 25°F range, 3 cycles, drift fraction 0.0002; published evaporation 200 US gpm and blowdown 98 US gpm. Absolute water temperatures are selected to realize the published range.
Inputs: Recirculating water flow = 2,271 m³/h; Hot water entering tower = 40 °C; Cold water leaving tower = 26.111 °C; Entering air wet-bulb temperature = 20 °C; Drift (% of circulating flow) = 0.02; Requested cycles of concentration = 3; the others as above.
| Result | Source | This calc |
|---|---|---|
| Evaporation | 45.425 m³/h | 45.425 m³/h |
| Drift | 0.4542 m³/h | 0.4542 m³/h |
| Blowdown required | 22.258 m³/h | 22.258 m³/h |
| Evaporation — US gpm | 200 gal/min | 200 gal/min |
WRC worked example: LSI +0.71
Source: WRC TT 874/2/21, Volume 2 (March 2022), printed p. 78 / PDF p. 97. Published sample: 25°C, pH 7.59, TDS 4479 mg/L, calcium hardness 1139.65 and alkalinity 129 mg/L as CaCO₃; pHs 6.88 and LSI 0.71. Makeup values are one-third of the sample to reproduce it at 3 cycles. Tolerance covers two-decimal source factors; The implementation uses the SI offset 273.15 K rather than the example's rounded 273.2; the resulting LSI difference is below 0.001.
Inputs: Hot water entering tower = 25 °C; Cold water leaving tower = 20 °C; Entering air wet-bulb temperature = 15 °C; Hottest wetted temperature for LSI screen = 25 °C; Makeup total dissolved solids = 1,493 mg/L; Makeup calcium hardness (as CaCO₃) = 379.9 mg/L; Makeup alkalinity (as CaCO₃) = 43 mg/L; Circulating-water pH at screening temperature = 7.59; Selected maximum LSI = 1; Requested cycles of concentration = 3; the others as above.
| Result | Source | This calc |
|---|---|---|
| Saturation pH at used cycles | 6.88 ± 0.015 | 6.883 |
| LSI at screening temperature | 0.71 ± 0.015 | 0.7068 |
| Projected circulating dissolved solids | 4,479 mg/L | 4,479 mg/L |
| Projected circulating calcium hardness as CaCO₃ | 1,140 mg/L | 1,140 mg/L |
DOE BMP 10: 3 to 6 cycles saves 20% makeup
Source: DOE FEMP BMP #10, Cooling Tower Management, accessed 2026-10-29, reports 20% makeup reduction from 3 to 6 cycles. This check uses its fixed-evaporation interpretation and negligible drift. The same page's claimed 50% blowdown reduction is inconsistent with M = E + B and N = M/B: B/E changes from 1/2 to 1/5, a 60% reduction. The calculator retains the conservative-solute balance rather than reproducing that inconsistent percentage.
Inputs: Requested cycles of concentration = 6; Site maximum cycles from other limits = 10; Selected maximum LSI = 1; Drift (% of circulating flow) = 0; the others as above.
| Result | Source | This calc |
|---|---|---|
| Makeup reduction versus baseline (%) | 20 | 20 |